My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Land Use
>
82-669, PLAT
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 2:36:10 PM
Creation date
10/7/2025 2:30:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Q� s <br />r AATE""'o 'DUMDARt N <br />`t ,J i <br />s i, NM4 fs <br />EDI�� <br />MINNEHAKA CREEK <br />IARE MIMMEfOMRA � <br />WATERSHED DISTRICT <br />P.U. Box 387, Wayzata, Minnesota 55391 M MNESorA Rltu <br />E/OARD Of MANAGERS. <br />David N. Cochran. Vies a Albeil t Lehman . lames S Russell a John E Thomas a Bat Aen "dmundsun <br />April 2b, 1982 <br />Ms Jeanne A. t4abusth <br />Zoning Administrator <br />City of Orono <br />Box 6b <br />Crystal Bay, 14innesota 553[3 <br />Re: Subdivision A bb9 <br />Tonka Lake properties <br />Uear Hs Aabusth. <br />APR 27 <br />CITY ()t ORU,,�p_, <br />As per yor request for comments concerni,ig the above mentioned <br />subdivision The Ainnehaha Creek oiatershed district has performed <br />a preliminary review of the plat dnd offers the followinq <br />comments. <br />1_ The first floor building elevatiol should be at least 1 foot <br />above the regional flood elevation of 931.5 MSL. <br />2. No fill material for the purpose of home and road <br />construction will be allowed belc,w the regional flood <br />elevation of 931.5 11SL. <br />3. A building setback of 75' must be maintained from the most <br />lakeward portion of the building toundation and the NOHW <br />(929 4 MSL. Lake Ainnetonka). <br />4. An erosion control barrier wi11 be provided to prevent the <br />transport of soil material during construction. This erosion <br />control barrier will oe maintained throug:iout the project <br />life <br />5 . All disturbed soil surfaces wi 1 l be sodded or seeded and <br />mulched upon the completion of €inal grading. <br />A permit must be obtai�ied from the MCWU prior to any construction <br />a.ld an application can be abtained through this office. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.