Laserfiche WebLink
F <br />Face 5 of 10 <br />7. Lsvinv of Fine. BeddinP 9rd jointing - All wor'f urdor these <br />sFecificatinns shall '-e r=st,ructe� in accordance xith lines <br />any' wraies ar shot,n on t-:e plans and as established by the <br />Enrine,,r. These lines and grades Tav be modified by the <br />En.,sneer as provided in the cnntract. The contractor shall <br />f,•.rnish at his own expense such nat,erials on(' labor as ma,y <br />be reau`rei f-)r setting batter boarris, templetes, patterns, <br />platforms, reference mints, )r other Tertirs or mints of <br />line or grade. <br />f'^he contractor sh911 give the Inspector sufficient notice of <br />his need for the establishment of line an,-' ,ar-de so the* the <br />Erinineer may ha.e sufficient time to provide some. After <br />lines and mrsdes for any p-+rt of the i,-)rk have been Given <br />by the Engineer, the conr,rgctor will be held res.ons+ble <br />r for the proper execution of the work to such lines and grades <br />and all sta4es or of^er marks given shall re rrotected and <br />preserved by him until authori-ed to re-4ove them by the <br />Inspector. The contractor Ghall, at his own exLense, correct <br />any mistakes that may be c9uped by their unaut^or17Pd distur- <br />bance or removal. The Inspector may require that work ',e <br />susoended at env time when for any regscn such T-,,ks cannot <br />be �:roperly followed. No additional coTper:s�tion will he <br />a'lowed `'ie contractor for any claims or crews belnc ^ell <br />up becqu`'e -)f back of line and grade stages. <br />1--1 ements, tools, ant ficiliries e,tisfactor.; to <br />trig_:cp ,tr`r shall be provided and lised bythecontractor <br />for the safe and conven+en, pr-secutIDn of the r:nrk. <br />i <br />Before lowering and while suspended, the pipe —all be In- <br />spected for defects And runty kith a 11�ht hammer (e•rcept <br />plastic ;:ipe) to detect any cracks. Any defective, iamaQed, <br />or uns-Dund plre wl'_1 be rejected. <br />04 All l oielgn matter or dirt shall be removed from the Insure <br />0 of t'ie Lire before it is lowered into its rosition in the <br />tre^ch, and shall be kept clean by apprnved means during <br />`°e an,j After la 'nv. All openings along the line of the <br />seater shall 1�e securely close' As directed, anal in the <br />sus -pension of w:,rlr qt any time, suitable stopr..ers shell Ire <br />r placed to prevent earth or other substances fror entering <br />the seller. <br />Pipe laying shall procee-+ upgrade ,,;kth t',e tongue ends pointed <br />in the dirention of thr flow. `Jo pl a shg11 ',e 191d in w4ter <br />or when the trench conditions Are unsuitall1- f^r such work, <br />« except by ,ermissin of the E nvineer. <br />r All pipe shall be bedded as inlic9ted )r. the plans and details <br />An l describe i a:: folloh s s <br />A. play F i e - Class C boollina from 0 - 14 feet pipe depth, <br />any C ass B bediinA for pipe depth from 24 - 10 feet, <br />with Ductile Iron 11pe used over 1'P feet deep. <br />