Laserfiche WebLink
P_ <br />Faze 3 -)f 10 <br />Basis of 1a.mt n` for services will -e t%+P lineal feet of <br />service � i_: e lnctalled r llis a t-;, P "A" or "B" service <br />connection item. <br />5. Fipe Foundation - Foundation for pipe server shall be in <br />conformance with MHD Specification 2451.3C2, except that <br />unsult•able foundation material shall he replaced with <br />porous backflll (crushed rock) conforming to MHD 3137 CA-19 <br />minimum si-e 3/4". Payment for pipe bedlina material <br />shall bt on the ton basis. The contractor will not be paid <br />for binder stone where it is used only to f-cilitate de- <br />waterinp. !!aul slips showing tonnage of all caarcregate <br />w material delivered to the job sitQ shall be submitted to <br />the nFineer on a iaily basis. No payment will be made for <br />material w'-tn the haul slips are submitted later t'ian one <br />workinz da✓ followinu lelivery of the material. <br />6. Eycavatlon an! Pre aratlor. of Trench - The trench shall be <br />dug to t^,e aliznment RnA depth shown on the plans and on1;r <br />.� so far in a"vance of construction as the Inspector shall <br />per At. The sides of the trench shall "e sloped and/or <br />braced and the trench drained so that wor'rmen car. .:or= safely <br />and efficiently. It is essen'ial that discharee pumps be <br />laid to natural drRinnge channels or to 3raln sewers. <br />Irr <br />Trench widths at the to: of the excavation nav var:i depending <br />.. u on the ierth of trench and t^e nature of the material en- <br />countered; however, the maximum allowably width of trench <br />at t�.e level of the top of pl:.e in place shall be the out- <br />slde diameter of the pipe plus twenty-four (24) Inches. <br />For trench width at V.ie tot_ of the Lipe erenter than n:) .el <br />above, she contractor ma'.' Lrocose alterns`e bedding, or al- <br />ternate strength of pace to is th of cover relationships <br />other than t-iose specified. D,jch cro:osils must be sub- <br />mitted to the Enzineer for approval in writing and with <br />pertinent pipe strength ani soil iRta at least fourteen (14) <br />days Lrior to the desired construction late. No extra <br />compens3tlon shall be Allowe' fot any increase in Twterlal <br />or construction costs creetel b , alterrRte plena. ..he-e <br />running sand, Gravel, or ot'�er mAteriil is encountered an: <br />the required trench width at the top of the pipe cannot be <br />maintained, the class of sewer pipe to be usel shall 1-e <br />calculated using the Marrton For-.ula for log'r on pipes <br />bisel -)n actual trench width usal in construction, the <br />irtual r:acl�fllled soil %-e1Sh', 3r' Clars "C" bedi. ir, unle4r <br />:nth• .17e_ s�eclfte!. <br />'".sterli1 for baFe s'?b111-9tt )n shs;l '^a 3%4" to 14" bl.^.2er <br />st. "ne �r i • r -n cruvel, -as leterzine! br ?' 'nspec tor. <br />UO <br />r <br />