.r
<br />t=
<br />ar
<br />quest. >hall , ncover, expose or otherwise make available for
<br />observation. inspection or testing as ENGINEER may re-
<br />quire, that portion of the Work in question. fnrmshing all
<br />necessary labor, material and equipment. If it is found that
<br />such Work is defective. CONTRACTOR shall bear all the ex-
<br />penses of such uncovering, exposure, observation. inspection
<br />and testing and of satisfactory reconstruction, including com-
<br />pensation for additional professional services, and an appro-
<br />priate deductive Change Order shall be issued. If, however,
<br />such Work is not found to be defective. CONTRACTOR shall
<br />be allowed an increase in the Ccntract Price or an extension of
<br />the Contract 1 ime. or both, directly attributable to such un-
<br />covering. exposure, observation, inspection, testing and
<br />reconstruction if he makes a Claim therefor as provided in
<br />Articles I I and IZ.
<br />Owne►.Nov Stop the Work:
<br />13.10. If the Work is defective. or CONTRACTOR fails
<br />to supply sufficient skilled workmen or suitable materials or
<br />equipment. OWNER may order CONTRACTOR to stop the
<br />Work, or any portion thereof, until the cause for such orJet
<br />'-as been eliminated: however, this right of OWNER to stop
<br />the Work shall not give ns, to any duty on the part of
<br />OW' IER to exercise this right for the benefit of CONTRAC-
<br />TOR or any other party.
<br />Common or Rrmovaf of (jfwtve Fork:
<br />13. 11 If required by ENGINEER. CONTRACTOR shall
<br />promptly, without cost to OWNER and as specified by ENGF
<br />NGER. either correct any defective Work. whether or not fab-
<br />rtcared. Installed or completed. or, if the Work has been re-
<br />jected by ENGINEER, remove it from the :tte and replace it
<br />with nondefer.ve Work.
<br />One yarr Cor►et'rion Period.
<br />13.1:. If within one year after the date of Substantial
<br />Completion or inch longer period of time as may be pre-
<br />s;ribed by law or by the term., : f any appticablt special
<br />guarantee required by the-ontraci Documents or by am spit.
<br />,;iftc provision of the Contract Documents. anv Work Is
<br />found to be defective. CONTRACTOR shall promptly,
<br />without cost to OWNEF and in accordance with OWN€R's
<br />written instructions, ether correct such defective Work, or, if
<br />it has been rejected by OWNER, remove it from the site and
<br />replace it with nondefective Work. If CONTRACTOR does
<br />not promptl, comply with the terms of such instructions. of in
<br />.in emcfgs.,Kv where (Nay would cause serious risk of toss Of
<br />Jamge. OWNER may have the detective Work corrected or
<br />he rejected Work removed and replaced. and ail direct and
<br />indirect costs of such removal anu replacement, including
<br />compensation for additional professttsnal servi:n :hall tx
<br />paid by CONTRACTOR
<br />4c't W4Ace o,J Dfirctrve Work
<br />1) 13 if, instal of requiring ;orrectton or removal and
<br />repU digs tit of defative Wnrk. OWNER land, prior to
<br />ENGIINIEER's rtctatssretrsdairon osf final payment, also Err11
<br />NEER►geefers toat,cety f)v#%ER ntav J i u In >iiih cast.
<br />4 acemaius, occurs prtor 10 E%GI%FFR's ecwnmendai,.>n
<br />of final pavmcit. a Change Order shall he issued incorporat-
<br />ing the necessary revisions in the Contract Documents, includ-
<br />ing appropriate reduction in the Canrract Price: or. if the ac-
<br />ceptance xcurs after such tecornmenaatton, an appropriate
<br />amount ,hall be pz,d by ('OtdTI(ACTOR m OWNER.
<br />OW VER .Wa.v Cerrec•r Defect,ve Work
<br />13.14. if CONTRACTOR falls within a reasonable time
<br />after written notice of ENGINEER to proceed to correct aea
<br />to corner •'ective Work or to remove and replace rejected
<br />Work as red .,red by ENGINEER in accordance with pars
<br />graph 13.11. r: r CONTRACTOk falls to per.'orm the Work
<br />in accordance with the Cantract Documents (including any re-
<br />quireint .its of the progress scheduler. OWNER may, after
<br />seven days' written notice :o CONTRACTUR, correct and
<br />remedy anv such dtfic;encs. In exercising his rights under this
<br />paragraph OWNER shall proceed expeditiously. Totheextent
<br />necessary to complete corrective and remedial action.
<br />OWNER may exclude CONTRACTOR trom all at part of
<br />the site. take possession of all or part of the work, and sus-
<br />pend CONTRACTOR's services related thereto. take posses-
<br />sion of CONTRACTOR's tools, appliances, constru.•tton
<br />equipment and machinery at the site and incorporate in the
<br />Work all materials and equipment stored at the site or for
<br />which OWNER has paid CONTRACTOR but which are
<br />stored els.where. CONTRACTOR shall all.ry OWNER.
<br />OWNER s -epresentatives, agents and employees such access
<br />to the site as may be necessary to enable OWNER to exercise
<br />his rights under this paragraph. All (blea lied indirect costs of
<br />OWNER in exercising such nghis shall be charged against
<br />CONTRACTOR in an amount -.trifled by ENGINEER. and a
<br />Change Order shall be issued .ncorporating the necessary revi-
<br />sions in the Contract Documents and a reduction in the Can -
<br />train Price Such direct and indirect costs .halt include, in MU-
<br />ticu{ar but without !imitation. compensation for additional
<br />professional services required and all costs m repair and
<br />replacement of work of athers Jesuoyed or damaged l.v ,or
<br />re.tion, removal or replacement of CONTRACTOR'S Jetc.-
<br />tive Work. CONTRACTOR shall not be allowed an extension
<br />of the Contract Time because jf anv delay in performance -,f
<br />the Work attributable !o the exercise by OWNER of
<br />OW'NER's rights hereunder
<br />IIRTICLE la —PAYMENTS TO CONTRACTOR AND
<br />COMPLETION
<br />SchedWa
<br />la 1 At least ten Jess prior to vubmittang the first Appli-
<br />;ation for a progress payment, CONTRACTOR shalt lexcept
<br />as )therwtse specified in the General Requt.ensentsl subastt to
<br />ENGINEER a progress .chedule. a final sihedtile of Sh"
<br />Drawing submission a^d *heft itpplicaltltt a schedUM of val-
<br />ues of the Work These schedule ."bl saetsfa.aaer to form
<br />and substance to ENGINEER Lhe sg6moliket vden taiall in-
<br />clude quantities and init prices 1011e COnttact
<br />Price. and shall tubdiv ide 'he Work me eow4mo tt Pori-, :n
<br />staffiaem detail to serve at he hasb for "mom oayllisortts
<br />during ;onstri-c-on L pan ac:et+taftc of the WhOdule of vM
<br />tie+ try E NC, { N E E R t snal i 9e ncorpm ad ittsto o f orsa of
<br />4pp4!cation list pwrsins a:ceptaMe tot EN(,thiEER
<br />
|