.r <br />t= <br />ar <br />quest. >hall , ncover, expose or otherwise make available for <br />observation. inspection or testing as ENGINEER may re- <br />quire, that portion of the Work in question. fnrmshing all <br />necessary labor, material and equipment. If it is found that <br />such Work is defective. CONTRACTOR shall bear all the ex- <br />penses of such uncovering, exposure, observation. inspection <br />and testing and of satisfactory reconstruction, including com- <br />pensation for additional professional services, and an appro- <br />priate deductive Change Order shall be issued. If, however, <br />such Work is not found to be defective. CONTRACTOR shall <br />be allowed an increase in the Ccntract Price or an extension of <br />the Contract 1 ime. or both, directly attributable to such un- <br />covering. exposure, observation, inspection, testing and <br />reconstruction if he makes a Claim therefor as provided in <br />Articles I I and IZ. <br />Owne►.Nov Stop the Work: <br />13.10. If the Work is defective. or CONTRACTOR fails <br />to supply sufficient skilled workmen or suitable materials or <br />equipment. OWNER may order CONTRACTOR to stop the <br />Work, or any portion thereof, until the cause for such orJet <br />'-as been eliminated: however, this right of OWNER to stop <br />the Work shall not give ns, to any duty on the part of <br />OW' IER to exercise this right for the benefit of CONTRAC- <br />TOR or any other party. <br />Common or Rrmovaf of (jfwtve Fork: <br />13. 11 If required by ENGINEER. CONTRACTOR shall <br />promptly, without cost to OWNER and as specified by ENGF <br />NGER. either correct any defective Work. whether or not fab- <br />rtcared. Installed or completed. or, if the Work has been re- <br />jected by ENGINEER, remove it from the :tte and replace it <br />with nondefer.ve Work. <br />One yarr Cor►et'rion Period. <br />13.1:. If within one year after the date of Substantial <br />Completion or inch longer period of time as may be pre- <br />s;ribed by law or by the term., : f any appticablt special <br />guarantee required by the-ontraci Documents or by am spit. <br />,;iftc provision of the Contract Documents. anv Work Is <br />found to be defective. CONTRACTOR shall promptly, <br />without cost to OWNEF and in accordance with OWN€R's <br />written instructions, ether correct such defective Work, or, if <br />it has been rejected by OWNER, remove it from the site and <br />replace it with nondefective Work. If CONTRACTOR does <br />not promptl, comply with the terms of such instructions. of in <br />.in emcfgs.,Kv where (Nay would cause serious risk of toss Of <br />Jamge. OWNER may have the detective Work corrected or <br />he rejected Work removed and replaced. and ail direct and <br />indirect costs of such removal anu replacement, including <br />compensation for additional professttsnal servi:n :hall tx <br />paid by CONTRACTOR <br />4c't W4Ace o,J Dfirctrve Work <br />1) 13 if, instal of requiring ;orrectton or removal and <br />repU digs tit of defative Wnrk. OWNER land, prior to <br />ENGIINIEER's rtctatssretrsdairon osf final payment, also Err11 <br />NEER►geefers toat,cety f)v#%ER ntav J i u In >iiih cast. <br />4 acemaius, occurs prtor 10 E%GI%FFR's ecwnmendai,.>n <br />of final pavmcit. a Change Order shall he issued incorporat- <br />ing the necessary revisions in the Contract Documents, includ- <br />ing appropriate reduction in the Canrract Price: or. if the ac- <br />ceptance xcurs after such tecornmenaatton, an appropriate <br />amount ,hall be pz,d by ('OtdTI(ACTOR m OWNER. <br />OW VER .Wa.v Cerrec•r Defect,ve Work <br />13.14. if CONTRACTOR falls within a reasonable time <br />after written notice of ENGINEER to proceed to correct aea <br />to corner •'ective Work or to remove and replace rejected <br />Work as red .,red by ENGINEER in accordance with pars <br />graph 13.11. r: r CONTRACTOk falls to per.'orm the Work <br />in accordance with the Cantract Documents (including any re- <br />quireint .its of the progress scheduler. OWNER may, after <br />seven days' written notice :o CONTRACTUR, correct and <br />remedy anv such dtfic;encs. In exercising his rights under this <br />paragraph OWNER shall proceed expeditiously. Totheextent <br />necessary to complete corrective and remedial action. <br />OWNER may exclude CONTRACTOR trom all at part of <br />the site. take possession of all or part of the work, and sus- <br />pend CONTRACTOR's services related thereto. take posses- <br />sion of CONTRACTOR's tools, appliances, constru.•tton <br />equipment and machinery at the site and incorporate in the <br />Work all materials and equipment stored at the site or for <br />which OWNER has paid CONTRACTOR but which are <br />stored els.where. CONTRACTOR shall all.ry OWNER. <br />OWNER s -epresentatives, agents and employees such access <br />to the site as may be necessary to enable OWNER to exercise <br />his rights under this paragraph. All (blea lied indirect costs of <br />OWNER in exercising such nghis shall be charged against <br />CONTRACTOR in an amount -.trifled by ENGINEER. and a <br />Change Order shall be issued .ncorporating the necessary revi- <br />sions in the Contract Documents and a reduction in the Can - <br />train Price Such direct and indirect costs .halt include, in MU- <br />ticu{ar but without !imitation. compensation for additional <br />professional services required and all costs m repair and <br />replacement of work of athers Jesuoyed or damaged l.v ,or <br />re.tion, removal or replacement of CONTRACTOR'S Jetc.- <br />tive Work. CONTRACTOR shall not be allowed an extension <br />of the Contract Time because jf anv delay in performance -,f <br />the Work attributable !o the exercise by OWNER of <br />OW'NER's rights hereunder <br />IIRTICLE la —PAYMENTS TO CONTRACTOR AND <br />COMPLETION <br />SchedWa <br />la 1 At least ten Jess prior to vubmittang the first Appli- <br />;ation for a progress payment, CONTRACTOR shalt lexcept <br />as )therwtse specified in the General Requt.ensentsl subastt to <br />ENGINEER a progress .chedule. a final sihedtile of Sh" <br />Drawing submission a^d *heft itpplicaltltt a schedUM of val- <br />ues of the Work These schedule ."bl saetsfa.aaer to form <br />and substance to ENGINEER Lhe sg6moliket vden taiall in- <br />clude quantities and init prices 1011e COnttact <br />Price. and shall tubdiv ide 'he Work me eow4mo tt Pori-, :n <br />staffiaem detail to serve at he hasb for "mom oayllisortts <br />during ;onstri-c-on L pan ac:et+taftc of the WhOdule of vM <br />tie+ try E NC, { N E E R t snal i 9e ncorpm ad ittsto o f orsa of <br />4pp4!cation list pwrsins a:ceptaMe tot EN(,thiEER <br />