Laserfiche WebLink
I <br />,edures of construction or to safety precautions or programs <br />incident thereto. The review and approval of a separate item <br />as such will not indicate approval of the assembly :n which the <br />item functions. CONTRACTOR shall make any corrections <br />required by ENGINEER and shall return the required number <br />of corrected copies of Shop Drawings a -id resubmit new <br />samples for review and approval. CONTRACTOR shall <br />direct specific attention in writing to revisions other than he <br />corrections called for by ENGINEER on previous submittals. <br />CONTRACTOR's stamp of approval on any Shop Drawing <br />or sample shall constitute a representation to OWNER and <br />ENGINEER that CONTRACTOR nas either determined and <br />.erifted all quantities, dimensions, field construction criteria, <br />materials, catalog numbers, and similar data or assumes full <br />responsibility for doing so, and that CONTRACTOR has re- <br />viewed or coordinated each Shop Drawing or sample µoh tie <br />requirements of the Work and the Contract Document< <br />5.2. Where a Shop Drawing or sample is required by the <br />Specifications, no related Work shall be commenced until the <br />submittal has been reviewed and approved by ENGINEER. <br />6.28 ENGINEER's review and approval of Shop Draw• <br />I <br />or samples shall not relieve CONTRACTOR from re- <br />sponsibility for any deviations from the Contract Documents <br />unless CONTRACTOR has in writing called EtiGINEER's <br />attention to such deviation at the time o: submission and <br />ENGINEER has given written concurrence and approval to <br />the specific deviation, nor shall any concurrence or approval <br />by ENGINEER relieve CONTRACTOR from responsibility <br />for error or omissions :n the Shop Drawings. <br />Continuing the Work. <br />6 29 CONTRACTOR shall carry on the Work and main- <br />tain the progress schedule during all disputes or disagreements <br />with OWNER. No Work shall be delayed or postponed pend- <br />ing resolution of any disputes or disagreements, excepr as <br />CONTRACTOR and 0%% NER mad otherwise agree .n <br />writing. <br />indemnification <br />6.30. To the fullest evtent permitted by law, CON- <br />TRACTOR shall indemnif. and hold harmless OWNER and <br />ENGINEER and !heir agents and rnplovees from and against <br />all claims, damages, losses and expenses ncluding but not <br />limited to attorneys' fees arising out of or resulting from the <br />performance of the work, provided that any such claim, <br />damage 'oss or expense la) is attributable to bodily injury, <br />sickness, disease or death, or to injury to or destruction of <br />tangible property (other than the Work itself) including :tie <br />loss of use resulting therefrom and ! b1 is caused in whole or in <br />part by any negligent act or omission of CONTRACTOR. am <br />Subcontractor, anyone directly or indirectly employed by any <br />of them or anyone for whose acts any of them may be liable, <br />regardltss of whether or not t is caused in part by a parry <br />indemnified hereunder <br />6 ?l In any ina all .omen, against OWNER or ENGI- <br />NEER w. any of their .ivent% or employees by any empieve- of <br />In <br />CONTRACTOR, any �abcontractor, anyone directly or indi- <br />rectly emploved by any of there or anvone for whose acts any <br />of them may be liable, the mdemnification obligation under <br />paragraph 6.30 shall not be limited !n an• way by any limita- <br />tion on the amount or type of damages, compensation or <br />benefits payable by or for CONTRACTOR or any Subcon- <br />tractor under workers' or workmen's compensation acts, <br />disability benefit acts or other employee benefit acts. <br />5.j2. The obligations of CONTRACTOR under para- <br />graph 6.30 shall not extend to the liability of ENGINEER, his <br />agents or emplovees arising out of the preparation or <br />approval of maps, drawings, opinions, reports, surveys. <br />Change Orders, designs or specifications. <br />AR i ICLE'—WORK BY OTHERS <br />- I O%k NER may perform additional wo-k related to the <br />Project by himself, or have additional -urk performed by <br />utility service companies, or let other direct contracts therefor <br />which shall contain General Conditions similar to these. <br />CONTRACTOR shall afford :he utility service companies <br />and the other contractors who are parties ?o such airect con- <br />tracts for OWNER, if O%k%ER is performing :he additional <br />work with OWNER', employees) reasonable opportunity for <br />the introduction and storage of matertais and equipment and <br />the execution of work, and shall properly connect and coordi- <br />nate his Work with theirs. <br />7.2. if any part of CONTRACTOR's Work depends for <br />proper execution or results upon the work of any such other <br />:ontrac:or .)r utility service company (or OWNER), CON - <br />RAC -TOR shall inspect and promptly report to ENGINEER <br />in writing anv patent or apparent defects or deficiencies in <br />such work that render it unsuitable for such proper execuuon <br />and results. CONTRACTOR's failure so to report shall con- <br />stitute an acceptance of the other work as fit and proper :or <br />integration with CONTRACTOR's Work except for latent or <br />non -apparent defects and deficiencies in the other work. <br />3 CONTRACTOR shall do all cutting. flitting and <br />patching of his Work that may be required to make its several <br />parts come together properly and Integrate with such otht <br />work. CONTRACTOR shall not endanger any work of others <br />by cutting, excavating or Otherwise altering their work and <br />will only cut or after their work with the written consent of <br />ENGINEER and the others whose work will be affected. <br />a. If the performance of additional work by other con- <br />tractors or utiltty service companies or OWNER was not <br />noted in the Contract Documents, written notice ;htreof shall <br />be given to CONTRACTOR prior o starting any such addi- <br />tional work. If CONTRACTOR believes that the perform- <br />ance of such additional work by OWNER or others involves <br />additional exptense to CONTRACTOR or requires an et <br />,ensign of the Contract Time, CONTRACTOR "nay make a <br />.[aim therefor as provided in Articles i I and 12 <br />