Shop Drawing3—A11 drawings, diagrams, illustrations, sched- <br />ules and other data which are specifically prepared by CON- <br />TRACTOR, a Subcontractor, manufacturer, fabricator, sup- <br />plier or distributor to illustrate some portion of the Work <br />and all illustrations, brochures, standard schedules• perform- <br />ance charts, instructions. diagrams and other information <br />prepared by a manufacturer, `abricator, supplier or distrib- <br />utor and submitted by CONTRACTOR to illustrate material <br />or equipment for some portion of the Work. <br />Spec,frcations—Those portions of the Contract Documews <br />consisting of written technical descriptions of materials, <br />equipment, construction systems, standards and work- <br />manship as applied to the Work and certain administrative <br />details applicable thereto <br />Subcontractor —An individual, firm or corporation having a <br />direct contract with CONTRACTOR or with any other Sub- <br />contractor for the performance of a part of the Work at the <br />site. <br />Substantial Complerion—The Work (or a specified part <br />thereof) has progressed to the point wt.ere, in the opinion of <br />ENGINEER as evidenced by his definitive certificate of Sub- <br />stat,tial Completion, it is sufficiently complete, in accordance <br />with the Contract Documents, so that the Work (or specified <br />part) can be utilized for the purposes for which it was in- <br />tended. or if there be no such certificate issued, when final <br />payment is due in accordance with paragraph 14.13 The <br />terms "substantially cc,mple­and "substantially com- <br />pleted" as applied to any too r to Substantial Comple- <br />tion tnere(A <br />Work —The entire ct .pleted :.instruction or the various sep- <br />arately identifiable parts thereof required to be furnished <br />under the Conte .t D,xui.,ents. Work is the result of per- <br />forming services, furnishing labor and `urnishing _nd iicor- <br />porating materials and equipment into the construction, all as <br />required try the Contract Documents. <br />ARTICLE 2—PRELIMINARY �t.ATTLRS <br />Delivery of Sondr: <br />2.1 When CONTRi 'TOR delivers the executed Agree• <br />ments to OWNER. CONTRACTOR shall also deliver •o <br />OWNER s!r:h bonds as CONTRACTOR may be require9 to <br />furnish in accordance with paragraph ! . <br />Copies of Doeuerents. <br />2.2. OWNER shall furnish to CON R ACTOR up to ten <br />copses (unim otheiwise syecifird in the General Req.vre- <br />ments) of this Contract Documents as are reasonably neces- <br />sary for the etteeuu.. - i the Work. Additional coptas will be <br />furnished. upon requasit, at the coat of reproduction <br />Commencement of Contract Time: ,Votice to Proceed: <br />:.3 The Contract Time will commence to run on the <br />thirtieth day after the effective date of the Agreement, or, if a <br />Notice to Proceed is given, on the day indicated in the Notice <br />to Proceed: but in no event shall the Contract Time commence <br />to run later than the ninetieth day after the day of Bid opening <br />or the thirtieth day after the effective date of the \greement. <br />A Notice to Proceed may be given at any time %ithw shirts <br />days after the effective date of the Agreement. <br />Starting the Project. <br />2.4 CONTRACTOR shall start to perform the Work on <br />the date when the Contra Time :oinmences to run. but no <br />Work shall be done at the site prior to the date on which the <br />Contract T me :orimences to run <br />3efore Starting Consrruc non: <br />2.3 Befo,e undertaking ea,h par-, o, the Work, <br />CONTRACTOR shall carefully study and compare the Con- <br />tract Documents and check and venfy pertinent figures shown <br />thereon and all applicable field measwemer,-s CON- <br />TRACTOR shall promptly report in writing to ENGINEER <br />any conflict, error or discrepancy which CONTRACI,:R <br />may discover; however, COS ACTOR shalt not be liable to <br />OWNER or ENGINEER for . lure to report any conflict. <br />error of discrepancy in the Drawuigs or Specifications unless <br />CONTRACTOR had actual knowledge thereof or should rea- <br />sonably have known thereof. <br />2.6, Within ten days after OP.- teetive date of the Agree- <br />ment (unless otherwise specified in the General Require- <br />ments), CONTRACTOR shall submit to ENGINEER for <br />review snd acceptance an est,mated progress schedule :n- <br />dicating the starting and completion dates of the various <br />stages of the Work, , •eliminary schedule or Shop Drawing <br />submissions. and a pr..minar% schedule of-_alues of the <br />M. <br />2.'. Be'ore any Wo, . -t the sat, is s.arted, CONTRAC. <br />TOR shall deliver to OWNER, w 'f, copy o ENGINEER, <br />certificates (and other evidence of insurance re-•uested by <br />OWNER) which CONTRACTOR is required to purchase and <br />maintain in accordance with paragraphs S 3 aria 3 4, and <br />OWNER shall deliver to CONTRACTOR certificae ,and <br />other evidence of insurance requested by CONTRACTOR) <br />which OWNER is required to purchase and maintay. ,n ac- <br />cordance with paragrayhs S 6 and S 7 <br />-econsrrucvron Conference <br />2 S. Within twenty days after the effective date ,f the <br />Agreement, bat before CONTRACTOR starts the Work at <br />the stir, a confero we will be held for review and acceptance of <br />the schedules referred to in pusigric 6, to esiabltsh peme <br />dares for handling Shop Drawings it" iher su". tau and <br />for processing ApplKati. A Payment. and to eseatihsh a <br />work,ns invlerstanding am Ong the parties as to t he W ork <br />