Laserfiche WebLink
I <br />Day -definition of <br />I <br />Defective Work. Acceptance of <br />13.13 <br />Defective Work, Correction or Removal of <br />13.11 <br />Defective -definition of <br />I <br />Defective work-in general <br />13 <br />Detective Work, Rejecting <br />9.4 <br />Definitions <br />I <br />Delivery of Bonds <br />2.1 <br />Disagreements, Decisions by Engineer <br />9.9, 9.10 <br />Documents. Copies of <br />2.2 <br />Documents. Record <br />6.19 <br />' <br />Documents. Reuse <br />3.5 <br />Drawings -definition of <br />I <br />Effective date of Agreement -definition of <br />I <br />Emergencies <br />6.22 <br />Engineer-defintion of <br />I <br />Engineer's -Notice Work is Acceptable <br />14.3 <br />Engineer's Responsibilities, Limitations on <br />9.11 thru 9.14 <br />Engineer's Status During Construction -in general <br />9 <br />Engineer's -Recommendation of Payment <br />14.4, 14.13 <br />Equipment, Labor, Materials &l►d <br />6.3 thru 6.6 <br />' <br />Equivalent Materials and Equipment <br />6.' <br />Fee, Contractor's -Costs Plus <br />11.6 <br />Field Order -definition of <br />I <br />Field Order -issued by Engineer <br />10.2 <br />Final Application for Payment <br />14.12 <br />Final Inspection <br />14.11 <br />Final Payment, Recommendation of <br />14.13, 14.14 <br />Final Payment and Acceptance <br />14.13 <br />General Requirements -definition of <br />I <br />General Provisions <br />11.3. 17.4 <br />Giving Notice <br />17.1 <br />Guarantee of Work -by Contractor <br />13.1 <br />Indemnification <br />6.30 thru 6.32 <br />Inspection, Final <br />14.11 <br />Inspection, Tests and <br />13.3 thru 0.' <br />Insurance, Bonds and -in general <br />3 <br />' <br />insurance-Ce tificates of <br />21 and 3 <br />Insurance, Contractor's Liability <br />'.3 <br />Insurance, Contractual Liabiht> <br />3 4 <br />Insurance, Owner's Liability <br />5.5 <br />Insurance, Property <br />3 o thry ! 12 <br />Intent of Contract Documents <br />3 1 thru 3.4, 9 12 <br />Interpretations and Clarifications <br />9.3 <br />Invesugauons of Physical Crndmons <br />♦ 2 <br />Labor. Materials and Equipment <br />6 3 thru 6 6 <br />Laws and Regulations <br />6.14 <br />Liability Insurance -Contractors <br />! 3 <br />Liabilty Insurance -Owners <br />Limitations •?n Engineer's Responsibilities <br />9 I <br />' <br />Materials and Equipment -furnished by Contractor <br />6 3 <br />Materials or Equipment -Equivalent <br />6 <br />Miscellaneous Provision% <br />I' <br />Modification--lefimuon of <br />S <br />