Laserfiche WebLink
Section 0080 GF.?1&3AL CONDITIONS <br />1. rat:e:EAL C014DITICNS <br />The current edition of the Standard General Conditions of <br />the Construction Contract, NSPS Document 1910-8, shall be <br />incorporated into and made a part o. Elie Contract as General <br />Conditions theraof, except as modifi:: in the Supplemental <br />General Conditions or the Special Conditions contained herein. <br />2. SUPPLEMENTAL GENERAL CONDITIONS <br />Certain articles of the NSPE General Conditions are revised <br />by, or are replaced by, requirements of the enclosed Supple- <br />mental General Conditions; such revisions or replacements <br />shall take precedence over the NSPE General Conditions. <br />C <br />i L <br />K PW <br />OR <br />1 M+ <br />an <br />we <br />