My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Land Use
>
82-669, PLAT
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 2:36:10 PM
Creation date
10/7/2025 2:30:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />_ 21.2 Completion of Work. <br />21.2.i. By submitting a Bid, and Pxecution of the Agreement, the Bidder <br />(and Contractor) express'.y agree3 the time (:v times for various phases) for <br />completion is reasonable, considering all factors. The Bidder (and Contractor) <br />further represents he has; analyzed the Project, including the Pquipment, materials <br />and methods; considered his own capabilities and work load; determinL-d availability <br />of qualified mechanics and unskilled labor; considered the time of year for <br />commencement of work, made a reasonable allowance for weather variations and other <br />potential delays encountered in the construction process; the condition of the <br />site; considered the constraints specified; evaluated the effects of other <br />contractors who may be on the site; and has taken these and other relevant <br />factors bearing on the progress of the work into account. <br />21.2.3. Each Bidder is required to fill in his date of full completion of <br />all work on this Project. <br />21.2.4. The Work shall be completed on or before /G,/rM �f' 15 /±22, <br />unless otherwise agreed in writing by Owner and Bidder (Contractor) ir. accordance <br />with Article 12 of the General Conditions. In the event that Bidder (Contractor) <br />fails to camplete the projict within the time period specified, Owner shall have <br />the right to pursue arbitration in accordance with the provisions of Article 16 <br />i <br />of the General Conditions, and Bids'>r (Contractor) shall be responsible to <br />Owner for the reasonable cost of pursuing arbitration proceedings, including <br />reasonable attorneys fees. <br />y _ j <br />
The URL can be used to link to this page
Your browser does not support the video tag.