My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4979
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 4900 - 4999 (November 25,2002 - June 23,2003)
>
Resolution 4979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 1:31:52 PM
Creation date
11/13/2015 1:31:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Mr. Dan Erickson May S, 2003 <br /> Minnesota Department of Transportation � 9 `�' � Page 2 <br /> � Yariance Justification �� :` <br /> Fox Street is an east-west street through a wetland area. The approaching roads on each side of <br /> the bridge have a pavement width of 24 feet and the total surface width, including the shoulders <br /> is 27 feet wide. Therefore, the shoulders are`1.5 feet wide on each side of the pavement. <br /> The roadway embankment has slopes of approximately 2H:1 V on each side. The slopes continue <br /> until they reach the wetland on each side of the road. <br /> The area is fairly well developed, except for the wetlands, at this time which reduces the <br /> likelihood of increased traffic volumes. Widening of the existing street would require filling of <br /> the wetlands. This will not occur due to the constant traffic volumes in the area and the impacts <br /> on the wetlands. <br /> Given the constraints of the existing wetlands, the design standards developed by MnDOT are <br /> difficult to comply with. Therefore, we outline the following points of justification for the <br /> requested variance: <br /> l. Substandard Streets: The streets in the area of the bridge are substandard compared to <br /> current MnDOT standards due to the wetlands. The approaching streets on each side of <br /> the bridge are approximately 24 feet in width and will continue to be that width in the <br /> . • future. The proposed bridge width is consistent with the approach roads. <br /> 2. Avoid Severe Environmental Imnacts: Widening of the bridge and the approach <br /> roadway would significantly impact the adjacent wetlands. Minimizing the amount of <br /> roadway width will limit the environmental impacts of the project by reducing the <br /> amount of fill that would be placed in the wetland. Minimizing the amount of filling of <br /> the wetland will increase the chances of receiving permits from environmental agencies. <br /> Impacts of the Variance <br /> Economic—The variance would allow a narrower bridge to be constructed. The narrower bridge <br /> would be less costly to construct which is a savings for the funding source which is anticipated to <br /> be the State Transportation Fund. The narrower bridge would not have any negative economic <br /> impact on the adjacent property owners. . . <br /> Social—The variance requested for the proposed bridge would not have any social impacts. <br /> Safetv—The variance for the proposed bridge will not significantly impact the safety of the <br /> public. The proposed bridge is about 2 feet wider than the existing bridge. Therefore, the wider <br /> bridge will improve the safety of the site as compared to the existing conditions. <br /> Environmental—The variance for the proposed bridge would have positive environmental <br /> • impacts. The variance would significantly reduce the amount of wetland area that would need to <br /> be filled by maintaining the same approach roadway width. <br />
The URL can be used to link to this page
Your browser does not support the video tag.