Laserfiche WebLink
STORM WATER POLLUTION PREVENTION PLAN FOR <br />MICHAEL HUTHW AITE <br />OF LOTS 8-11, BLOCK 5.,,_ BAYSIDE ADDITION TO LAKE MINNETONKA <br />HENNJ?;PIN COUNTY, MINNESOTA -----~-(948.7) <br />EXISTING <br />I I \_ HOUSE j <br />\ <br />\ I t3390 \ \ ~!fl· <br />\ <br />\ <br />(><4-9) •• ••• ..~o \ : • .. />. <br />\ \ <br />.. · "/• <br />\ <br />\ \ . •.. . <br />\ <br />(936.~ <br />"" <br />\ <br />\ <br />\ <br />\ <br />\ <br />\ <br />\ <br />\ <br />\ \ \iii'~ .:t .,'o._ ... -s <j \ <br />"" "" "" "" ~ <br />\ <br />\ <br />\ <br />~ <br />(9J6.8) <br />\ <br />~ <br />~ <br />-S" PVC SANTARY SEWR \"'( <br />0 20 <br />!""''"'~ <br />SCALE <br />40 <br />i <br />IN <br />Temporary Erosion Control and Sequencing <br />FEET <br />1. Install perimeter control fencing per the standard detail plates. No more than <br />600 linear feet of silt fence should be continuous and collecting at one point. <br />Undulate the silt fence or use "sirnles" or crescents of silt fence. <br />2. Use horizontal slope grading <br />3. Install erosion control around any temporary dirt stockpile areas. <br />4. All septic areas to be fenced off for protection. Protection to extend a <br />minimum of 20' outside of septic areas. <br />5. The contractor for the project shal inspect all erosion control BMP's after <br />each rainfall and repair as necessary and remove sediment from sitf fences <br />n It reaches 1/3 capacity. <br />6. The contractor shall schedule his operations to minimize the amount of <br />disturbed area at any given time. The contractor shall limit his activities <br />to the grading limits as shown. · <br />7. Remove all temporary BMP's once the site has reached final stabilization (a <br />unifonn perennial vegetative cover with a density of 70 percent over all pervious <br />surface areas). <br />Pennanent Erosion Control <br />1. All exposed soils on site must be stabilized with in 3 days: <br />a. Stabilization on slopes flatter than 4:1 consists of disc-anchored <br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas <br />of concentrated flows consists of erosion blankets and seed. <br />2. Temporary mulch and seed is needed tor exposed areas which sit fallow for <br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21 <br />days. Also open stockpiles need to have temporary stabilization n they are to <br />remain inactive for more than 7 days. <br />STORM WATER POLLUTION PREVENTION PLAN BEFORE AND DURING CONSTRUCTION <br />1. The following stonn water pollution prevention measures are shown <br />on the plans and shall be implemented prior to construction: <br />• Install silt fence around the perimeter of areas to be graded as <br />shown on the stonn water pollution plan. <br />• All temporary stockpiles must have silt fence around them to trap <br />sediment. <br />• Phase grading won< to minimize the duration that any disturbed soH <br />is exposed. <br />• Seed and mulch must be applied within 72 hours after rough grading is <br />complete. <br />• Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. <br />• Remove any sediment that has been tracked onto public or private streets <br />within hours. <br />* Remove any spill 01 fuel, oil, or other chemical immediately upon detection. <br />• Store construction materials in an orderly manner. <br />• Repair silt fences, rock construction entrances. and other erosion and <br />sediment controls as needed. <br />2. Storm Water Pollution Prevention After Construction <br />The contractor shall implement the following stonn water pollution prevention <br />measures after construction: <br />• All distrubed areas without pennanent impenneable surfaces will be <br />vegetated for final stabilization. <br />• Silt fence and other erosion and sediment control devices will be removed <br />after vegetation is established <br />• Contractor shall maintain a construction activity log with dates of major <br />grading activities, dates grading stops and spills. <br />• Keep SWPPP and inspection log accessible on site. <br />~-~--~-~..;:.:: <br />(i) ~ ~"""' -w- <br />I B --1 SHED -9.fs--_ __ - <br />I --- <br />4b ~J 1 <br />I <br />I s <br />~ <br />(/) <br />0 <br />0 <br />0 <br />'---0 0- <br />\ <br />0 <br />0 = <br />rrl <br />\ <br />'--- <br />----- <br />(94-<.9) <br />-' <br />'-._ <br />(') <br />~ <br />tJ:j <br />UJ. <br />~ <br />tJ:j <br />~ <br />,941.9) <br />MAlffllE <br />~\ > <br />/ <1<•39.2) <br />I tJ:j <br />---..../ <br />IZ <br />IC <br />I tJ:j <br />I <br />I <br />I <br />I <br />~ <br />~ <br />/: <br />If <br />.:i <br />40 <br />--/ I <br />l(l <br />:,; <br />;o <br />I <br />939.J) <br />Si~~o,1-~·-........... N 89°46' 11" W 107.00················ ) <br />~l"q,;"ll"f: <br />(9;t.9) <br />--------?o,[Dc.'f: / -..__ Di,,_ Qr, ./ -~-~----~~------- <br />) BAYSIDE ROAD / <br />8" PVC SANITARY SEWER / ~ <br />(9Jll.7) (9J9.J) <br />3. Notification <br />• If sediment from the site is observed on adjacent streets or other properties, <br />the contractor shall remove the sediment within 24 hoers of detection or notification. <br />• If sediment from the site is observed on adjacent streets or other properties, the <br />inspector shall identify the source and discharge location of the sediment and instruct <br />the contractor to implement additional erosion .:md sediment controls at those <br />locations to prevent future discharges. <br />• rf building materials, chemicals, or gener2J refuse is being used, stored, disposed <br />of, or otherwise managed inappropriately, the contractor shan correct such detects <br />within 24 hours of detection or notifir.ation. <br />• If excessive sediments or debris ara observed at the flared end section outfalls, <br />the inspector shall determine tt,e source and discharge locations of such materials. <br />If the discharge has occurred on the property, the contractor shall remove the <br />sediments and debris within 24 hours of notification and correct the source of <br />such materials as directod by the inspector. <br />LE <;AI_ DESCRIPTION OF PR~UIS~S <br />Lot.s 8, 9. 10, ond 11 , Block 5, Bayside Addition to Lake Minnetonka <br />o : denotes iron marker <br />(908.3): denotes existing spot elevation, mean sea level datum <br />I 91 0 .8 I : denotes proposed spot elevation, meon sea level datum <br />_ -917--: denotes existing contour line, mean sea ievel datum <br />~: denotes proposed contour line, mean sea level datum <br />Bearings shown are bosed upon an assumed datum. <br />This survey shows the bo1X1daries of the above described property, the locotion of an existing <br />creek, and the proposed location of a proposed house, porch, patio. wolls, contours, grodes, <br />and driveway thereon. It does not purport to show any other improvements or encroachments. <br /><D <br /><D <br />I <br />DATE DESrnlPTION $ GRONBERG AND <br />0-2J-09 ffiOPOSlll t<XJSE, ORIVEWAY, PATIO'S AN> WALLS 5"0WN P • ASSOCIATES INC <br />DESIGNED REVISION I hereby certify that this survey was prepared by me, <br />or under my direct supervision, and that I am a duly <br />registered Civil Engineer and Land Surveyor under the <br />laws of the State of Minnesota. <br />SCALE <br />1"•20' <br />DRAWN -9-25--09 PR.a>OSEO GRADES AN> SI. T FENCE SI-OWN , • <br />J 10-12-09 llEl.tUTEO WETLAN> NO SLff"ER AOOEO CONSULTING ENGINEERS, LAND <br />• SURVEYORS, & SITE PLANNERS <br />CHECKED -445 NORTH WILLOW DRIVE <br />09-239A <br />LONG LAKE, MN. 55356 <br />952-473-4141 Mork <br />DATE <br />9-~ <br />JOB NO. <br />09-239A <br />11·11·. :.:-.:·· .. -·-.::; <br />~1 1iBJ~ <br />~o;(l~ <br />"O <br />() <br />m >< =r-e= ;:;: <br />~