Laserfiche WebLink
3. #09-3428 MICHAEL AND MARILYN HUTHW AITE, 3382 BAYSIDE ROAD, <br />VARIANCES AND CONDITIONAL USE PERMIT, 6:58 P.M. -8:08 P.M. <br />Michael and Marilyn Huthwaite, Applicants, were present along with Jeremy Steiner, Attorney-at-Law, <br />and Rick Hendel , Builder. <br />Curtis stated the applicant is requesting a conditional use permit for grading within 75 feet of Stubbs Bay <br />Creek to construct a replacement residence and lot area, creek setback, and hardcover variances within the <br />0-75 foot zone and the 75-250 foot setback zone. <br />The property consists of four separate tax parcels under one address where a home has existed for a <br />number of years. The subject property lies within the LR-IA zoning district, contains Stubbs Bay Creek <br />and wetland. The redevelopment of the property has also triggered the application of the City's wetland <br />regulations, requiring a buffer. <br />The combined area of the four lots is 34,400 square feet or .79 acres when the zoning district requires two <br />acres. The existing home meets the street and side yard setback requirements . The applicants' proposed <br />home does not meet any yard setback requirements. They have proposed a 41.2 foot setback from <br />Crestview, which will essentially become their front/street yard with the driveway reorientation; a 48 .2 <br />foot setback from Bayside Road is proposed where a SO-foot setback is required from both streets . <br />They have proposed 16 .9 foot to 24-foot setbacks from the side lot lines where 30 feet is required. <br />The house would be as close as 48 feet to the creek when the shore land regulations require a 75-foot <br />setback. The gravel driveway and attached garage on the existing home on the property were located <br />entirely within the 75-foot creek setback. <br />Hardcover in the 0-75 foot zone is proposed to be 11.24 percent, reduced slightly from the existing 11.4 <br />percent. Hardcover within the 75-250 zone jumps from an existing 11 .1 percent to 33.6 percent proposed. <br />In addition to the proposed 3 ,682 square foot home and 715 square feet of proposed patio, and 2 ,018 <br />#09-3428 MICHAEL AND MARILYN HUTHW AITE, CONTINUED <br />square feet of hardcover in the driveway and courtyard, there are 315 square feet of proposed retaining <br />walls and a proposed foot bridge spanning the creek . <br />Since the earthwork will take place within the creek located within the 0-75 foot zone and exceeds 10 <br />cubic yards , a conditional use permit is required. The applicants are working with the MCWD on the <br />stream bank stabilization project. <br />The proposed bridge over Stubbs Bay Creek poses a number of issues. First, Orono Code prohibits <br />structures within 75 feet o this protected tributary. Second, the bridge constitutes hardcover within 75 <br />feet of the tributary, which is not allowed . Additionally, the bridge cannot be considered the equivalent of <br />a stairway, lit, landing, or lockbox that would be allowed at the shoreline of a lake because it is not <br />needed for access to the shore due to the presence of a bluff or steep slope. Also , the bridge would appear <br />to function merely as an amenity to the property and does not provide necessary access to a portion of the <br />property that is lacking accessibility because the property south of the creek can be accessed directly from <br />the public roads in the immediate vicinity. There is also a concern that should the creek reach a level that <br />would inundate the bridge of its underpinnings, the bridge could fail and be swept downstream and <br />conceivably contribute to blockage of the culvert under Bayside Road , causing flooding. For all these <br />reasons , Staff recommends that the proposed bridge not be allowed.