My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4973
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 4900 - 4999 (November 25,2002 - June 23,2003)
>
Resolution 4973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 1:29:26 PM
Creation date
11/13/2015 1:29:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � , <br /> � O� . <br /> O O <br /> • �� g � CITY of ORONO <br /> � � � - ti <br /> ��� � �G'�' RESOLUTION OF THE CITY COUNCIL <br /> �kEs80g' NO. _ � � ��' `� . <br /> A RESOLUTION GRANTING APPROVAL <br /> FOR SEWER CONNECTION FOR <br /> PROPERTY LOCATED AT <br /> 465-485 ORONO ORCHARD ROAD SOUTH <br /> WHEREAS, Edward Hamm* (hereinafter"applicant")is the owner of property in <br /> the City of Orono located at 465-485 Orono Orchard Road (hereinafter "the properiy") legally <br /> described as follows: <br /> Exhibit A attached; and <br /> VV�iEREAS,the property is approximately 18 acres in area and contains a principal <br /> residence structure containing 8 bedrooms and two individual guest house or caretaker house <br /> structures each containing 1 bedroom,which would normally require 3 individual septic systems and <br /> • 3 alternate drainfield sites; and <br /> WHEREAS, the existing septic systems serving the 3 dwelling units are <br /> interconnected and have exhibited intermittent failure for many years, and are also nonconforming <br /> due to lack of 3' separation from the zone of seasonal saturation; and <br /> WHEREAS,a site evaluation has been completed by a licensed Site Evaluator and <br /> it has been determined that the property contains only two suitable drainfield sites instead of the six <br /> that would normally be required, and use of such sites would have the following negative impacts: <br /> 1. Use of the tested sites would require continued interconnection of septic systems <br /> serving three individual dwellings, and the associated complexities and problems <br /> inherent in such interconnections. <br /> *as Trustee under the Trust of Edward H. Hamm originally established on August 14, 1992, as <br /> subsequently amended and restated in its entirety by Amendment and Restatement of Trust of <br /> Edward H.Harrun dated October 10, 1995,and as further amended and restated by Amendment and <br /> Restatement of trust of Edward H. Hamm dated February 26, 1999. <br /> • Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.