My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1513 Bay Ridge Road - 10-117-23-34-0008
>
Land Use
>
11-3516, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 1:28:47 PM
Creation date
10/2/2025 1:27:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, August 8, 2011 <br />7:00 o'clock p.m. <br />*7. #11-3516 ROBERTS. Sl\rvDER, 1513 BAY RIDGE ROAD -VARIANCE- <br />RESOLUTION NO. 6065 <br />Rahn moved, Printup seconded, to adopt RESOLUTION NO. 6065, a Resolution Granting a <br />Variance to Municipal Zoning Code Section 78-305 for the property located at 1513 Bay Ridge <br />Road. VOTE: Ayes 4, Nays 0. <br />ITY ENGINEER'S REPORT <br />APPROVE FORCE MAIN REPLACEMENT OF GRINDER STATION #1 (2635 NORT <br />DRIVE) <br />Printup seconded, to accept the quotatioll'in the amount of $5,000 from Ge' mger <br />of Watkins, Minnesota, for force main replacement at GS#l. VOTE: es 4, <br />*9. T SEWER EXTENSION PROJECT <br />Rahn moved, Printup s onded, to award the contract in the amount of ,725.00 from RPU, Inc., <br />for completion of the Fox reet Extension project with project fundi . 'paid by the property owner <br />at 3125 Fox Street who has ecuted a special assessment agreemen OTE: Ayes 4, Nays 0 . <br />10. CHANGE ORDER NO. -NORTH FARM ROADS , TARY SEWER PROJECT <br />Kellogg stated this is a project that was rted last fall and is ,' a neighborhood located on the south side <br />of County Road 6. It has a private road. · hty percent of e property owners petitioned to have this <br />project move forward , so the Council approv the proj c?.' and a pressure system was installed. The <br />assessments were adopted last fall. Total costs the oject came in under the estimate slightly. <br />Rahn asked in regards to the extra piping to prote <br />better idea as the project was being completed. <br />Kellogg stated each property is served by he main trunk was installed along one <br />side of the road . There were more prop ies on one side of the ad than the other but that it made more <br />sense to put the main on the other sid f the road due to some wet d issues . Prior to the construction, <br />the City has information on where , septic systems are located and · office estimates where the <br />property owner might likely hoo p to sewer on their property. <br />Kellogg stated as in other pr ects , the property owners in this neighborhood d the option to dictate <br />where they wanted the cu stop on their property. The added length of pipe is relocation of the <br />service from where the~ ere originally shown on the plans. There was one prope located in the cul- <br />de-sac area that had t rr curb stop depicted in one location but was moved approxim ly 50 feet due to <br />an uncertainty of w re the curb stop was going to go. <br />intup seconded, to approve Change Order No. 1 for the North Farm Ro <br />ayers, in the amount of $1,905. VOTE: Ayes 4, Nays 0. <br />Page 13 of 21 -·-----------------
The URL can be used to link to this page
Your browser does not support the video tag.