My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Land Use
>
91-1618, SKPLAN
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 12:52:37 PM
Creation date
10/2/2025 12:50:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />c <br />property for several ,ears as Hurd aerial surveys show. The Keeslings <br />(owners of a home on a 50'lot, lot 19) have a few feet of the road now on <br />their property. Wendy Storling (owner of a 50' lot plus portions of lot 21) <br />stated that we have no easment across her property. I stated that was not <br />the case and she was fully aware of the easement which is recor6--d against <br />her property and is an attached Exhibit A for your reading with this sketch <br />plan. The Keeslings and Wendy stated they would not give an easement. I <br />have an easement across lct 20 and if I steer a little to the left I don't <br />touch the Keeslings foot or so. Please note that Wendy must trespass (if <br />they want to use that word) onto my property (lot 21) to get out of her <br />garage. I searched the 'iorrens Certificates and The Storlings and Keeslings <br />do not have a recorded easement to cross lot 17 S 18. However, in <br />consulting Robert Mitchell from the Linquist-Vennum law firm, he feels <br />access is not the problem. The public use of said property for more than 15 <br />years allows access. In addition the City has maintained winter snow <br />ret, —al up to and through lot 20 for more tfan 6 years thereby making that <br />portion a public street. As you can see by the survey, I have a <br />nonexclusive driveway easement for the rest. If the city must condemn the <br />necessary land so be it. <br />To minimize environmental impact and hardcover, I am proposing a 50, <br />surfaced cul de sac with 100' right of way as indicated on the sketch plan <br />and a 16' hard surfaced private drive following basically the same path as <br />the existing road (which is partially hard surfaced already). The position <br />of the cut de sac will provide a greater read distance from Wendy Storling's <br />property. Entrance enhancements and gates will be constructed as to City <br />approval. The issue of the access road hardcover was accepted by the <br />Planning Commission previously. Water run off from the road will be <br />collected into a drainage pipe aryl directed to a holding pond. <br />I called John Gairhartscn (sp) to inquire on the depth of the sewer manhole <br />nearest the project (lot 20 is hooked up to the sewer). He stated the depth <br />to re 4 112 feet, so a lift station will be necessary to provide waste <br />disposal from the sites. With sewer being brought out to the point, the <br />existing home (lot 30) will now have sewer available and should share in the <br />expense of providing such. Sewer and other utilities access will come <br />along the southwest shoreline side of the porperty to a;oid damage to the <br />root system of the large trees along the road area. <br />Environ,-nentaly, great care is to be taken to preserve the natural setting <br />that makes this site desireable. At Jeanne Mabusth's suggestion, other <br />than existing, only a 50' strip of grass will be allowed around the home <br />site. The shoreline vegetation will remain intact. Dockage will be along <br />the norhteast shore with three private docks positioned along the <br />400'shoreline. The homeowners associatin for th,s project will be jointly <br />responsible for maintainence and upkeep. The large outlot A includes the <br />road and open space areas from the cul de sac on up to the first homesite. <br />The outlot would be kept natural and as :s (minus brush and debris presently <br />onsite.) The site name of "San De Mar" stands for sand and marsh <br />representing the substantial sandhill, sand} shoreline and 'she marsh like <br />area. The marsh area is not a dedicated marsh area as far af the DNR :s <br />-oncerned, however it will be maintained as such. Land contours will not be <br />..,ltered as in the Marco Franklin proousal. We wi'1 build on slabs for site <br />one and two and excavate for a basemente for site thicc leaving all other <br />
The URL can be used to link to this page
Your browser does not support the video tag.