My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1428 Baldur Park Road - 08-117-23-34-0059
>
Land Use
>
82-695, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 9:22:31 AM
Creation date
10/2/2025 9:20:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE PLANNING COMMISSION MEETING OF JULY 19, 1982 <br />Pace 1.0 <br />McDonald noted that the Planning Commission hadn't <br />decided which side of the road they preferred the <br />proposed structure to be on. <br />Rovegno felt that it should stay roucihl y the same with <br />a two stall garage and the second story. <br />Kelley suggested that the workshop be added onto the <br />existing house. That way he could heat the workshop <br />year round. <br />Opheim stated that it wa= a strange iot with the lake <br />and ti,at the total iss-c- is how much additional hardcover <br />could they be approving. If the applicant proposed a <br />"normal" sized garage that he wouldn't have any problem <br />with it. <br />Rovegno stated that if it was built on the house side it <br />would be out of the 75' cetback area. lie suggested that <br />it be put on the --ie of the house away from the 0-75' <br />setback line. <br />Opheim stated once again that if the applicant came up <br />with a normal two -tall garage and put it, on the same <br />side as the exi, garage, in replacement of that garage <br />it would be L t <br />Rovegno noted the erosion problem and suggested that the <br />shoreline may need smoe rip rap. <br />Goetten suggested that the garaqe should be on the same <br />side of the street as the existing structure and suggested <br />soil borings be done for determining if the soil could <br />handle such a structure. <br />Kelley felt the same side as the existing garage, two <br />stall and two story. <br />liammerel concurred with Kelle-Y. <br />McDonald suggested a two stall narage on side of house <br />(lot 8) and no second story. <br />Rovegno stated that the other side of the street would <br />be fine as long as they directed the drainage away from <br />the lake. Two story, reduce size, and don't increase <br />the hardcover. <br />Opheim stated that the proposers structure should be on <br />the side where current garage is. The structure should <br />be two stalls and soil borings should be clone to determine <br />whether the soil could withstand a two story gtrue:ture. <br />Vote: Ayes (0), Nays (0). <br />ROTH (CONT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.