My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 10/24/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 10/24/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:45 AM
Creation date
9/30/2025 9:11:41 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
10/24/1988
Retention Effective Date
9/30/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I'A Bonestroo <br />_-M Rosene <br />Anderlik & <br />Associates <br />Engineers & Architects <br />rlu."ust 5, 11,l88 <br />Ci _,r of Orono <br />Bova 66 <br />Crystal Bay, MN 55323 <br />Ati_n: Jeanne Mabusth <br />Re: 139-1309 Gerald Nelsm <br />Dear Jeanne: <br />Ono C. Borvuroo. PE <br />Kedn A Go�jon. PE <br />Robe" W RoWf%e. PE <br />RKhafd W Foster. ►E <br />loWon C AndeniK. PC <br />Donaw C Burgaral. PE <br />&aaford A Lemberg. ►E <br />hrry A Bowdon PE <br />btnxd E turner PE <br />%tart A Hanson. PE <br />lames C Olson. PE <br />Tea K Feld. PE <br />Glenn R Coor. PE <br />MKnael f RRWmann ►F <br />Thomas E Noyes. PF <br />Robert R Plettene. PE <br />Robert G ichunKhl. PE <br />DWd O Loskofa, PE <br />Marvin L Sorvaw PE <br />lhomat W Pel0son PE Chants A E,KYton <br />MKhall C LyrKh, PE Leo M P~lSky <br />/#met R Mauna. PE Harlan PA Olson <br />KMnelh P Anpenon PE Susan M Etorlm <br />Ke PF Md'K A Se,V <br />R i <br />+ $anldrd P( <br />sf <br />We have reviewed the ponding area and r,ck constructed at 1629 Bohns Point <br />Road. The majority of the work was completed in the 100 year Floodplain area. <br />The pond was excavated and a plastic liner placed in the bottom. The pond <br />banks were constructed with large boulders. The construction of a rock path- <br />way was constructed as shown. Plantings with woodchips and filter fabric were <br />placed around the pond. The construction appears to have blocked drainage <br />from the east. We will need additional elevations from the property owner on <br />the site. The swale gourh of the house should be reconstructed as it doesn't <br />drain properly. <br />The pond would not seem to provide a s'gnificant improvement to the quality or <br />quantity o: water di;charged to the lake. <br />If you have any questions, please contact this office. <br />Yours vary truly, <br />BONESTROO, ROSENE, ANDERLIK 3 ASSOCIATES, INC. <br />='-- �4,1L <br />Glenn K. Cook <br />GILC:kj <br />EncI. <br />980if <br />tin sot "10W W 26 0 ft. ftUL MreWs"a M 13 06124MAM <br />
The URL can be used to link to this page
Your browser does not support the video tag.