My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
10-24-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
9/30/2025 9:11:41 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
10/24/1988
Retention Effective Date
9/30/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE PLANNING COMMISSION MEETING HELD AUGUST 15, 1988 <br />ZONING FILE #1309 CONTINUED <br />water collected in those areas, however, it still did not solve <br />the problem. In his opinion, the fill that was brought in along <br />the edge of the water to the stone wall was the reason for the <br />problem. Mr. Lohmar is a civil engineer and he took transit <br />readings of the level of fill and determined that there is 9" of <br />fill at one point in front- of the rock wall. when the house was <br />built, all of the excavation was piled up in front where the <br />house now sits and the whole front --area was built up with 4' of <br />dirt. Later it was discovered that the dirt had to be removed, <br />but in doing so, 0-9" of dirt was left behind. Mr. Lohmar is <br />only concerned with drainage. He felt that what the Nelsons <br />have done is the best possible solution to the problem and has <br />improved the site 100%. Mabusth noted a certificate of occupancy <br />could never have been issued to the property because of several <br />building code violations and the drainage problem along thy- south <br />lot line. A certificate of occupancy was issued only after Lyman <br />Lumber, actual owner of the property at the time of issuance, <br />executed an attested disclaimer assuming all responsibility for <br />the corrective drainage work. <br />Kelley reiterated his desire to table the matter until more <br />research could be done to solve the problem. He would like a <br />report from the City Engineer stating the best possible solution <br />to the drainage problem. Mabusth asked for specific direction <br />regarding the five points set forth in the August 11, 1988 memo. <br />Kelley addressed each of these five issues. Bellows stated that <br />there was a need for a demonstrated hardship pertaining to the <br />pond. One major issue to be addressed by the City Engineer is how <br />much impact restoration of the yard to its original state will <br />have on the entire area. Applicant presented pictures showing <br />the elevation of the berm on the adjacent property which is 3 or <br />4 times higher than his and asked why that was acceptable. <br />Bellows explained that the difference is due to the Nelsons' berm <br />lying within the flood plain. The issue 4 s alteration of land <br />within the flood plain. <br />The issue of the vegetation was discussed. Mr. Nelson <br />stated that he has no access to remove the other 20' pines should <br />they also die. Bellows suggested that should the Nelsons plant <br />vegetation in the flood area, they choose vegetation that can <br />withstand excessive water.. <br />There were no comments from the public regarding this matter <br />and the public hearing was closed. <br />it was moved by Kelley, seconded by Bellows to table 01309. <br />Motion, Ayes-S, Nays-0, Motion passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.