My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
10-24-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
9/30/2025 9:11:41 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
10/24/1988
Retention Effective Date
9/30/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE PLANNING COMMISSION MEETING HELD AUGUST 15, 1988 <br />ATTENDANCE 7:00 P.M. <br />The Orono Planning Commission met on the above date with the <br />following members present: Chairman Kelley, Johnson, Bellows, <br />Moos; Cohen arrived at 7:05 p.m and Brown arrived at 7:20 p.m. <br />The following represented the City staff: Building & Zoning <br />Administrator Mabusth, Assistant Planning & Zoning Administrator <br />Gaf frog.___ mad_ J^ytx Recorder Schef f ler. Council Representative <br />en attended and--CguncilmemherXallahan was also present. <br />11309 GERALD NELSON <br />1629 13OHN'S POINT ROAD 1 <br />AFTER -THE -FACT CONDITIONAL USE PERMIT <br />PUBLIC HEARING - 7:00 P.M. TO 7:20 P.M. <br />The Affidavit of Publication and Certificate of Mailing were <br />The applicants were present for this matter. <br />Building and Zoning Administrator Mabusth explained that <br />applicants were seeking an after -the -fact application for <br />approval of hardcover and excavation within the 75' setback area <br />and the flood plain. This matter had been reviewed back in 1985 <br />by the Planning Commission and City Council. Krutziq Builders <br />was issued a building permit and advised that hardcover within <br />the 75-250' setback area exceeded the 4,725 s.f. allowed in that <br />area. Krutzig filed a variance application which was denier?. <br />H-)wever, because of various engineering designs submitted with <br />that application, the builder did receive approval to build a 900 <br />s.f. deck in the lakeshore yard, which was not considered <br />hardcover. <br />The Resolution stated that :ertain drainage changes had to <br />Le made which involved the installation of swales along both <br />sides of the property. The swa le on the south ,ot line had to be <br />one foot lower in elevation than the east property owners' <br />driveway elevation. Mabusth stated that the City had never <br />approved the drainage on the property. There have been no <br />problems with the Swale on the north side of the property, but <br />there has been trouble with drainage on the south side of the <br />property. Upon inspection of the property, Mabust'i noted that <br />the south swale does not conform to the specificatio.is set out by <br />the City Engineer. <br />Applicants have installed an excavated pond in the lakeshore <br />yard, with a plastic underlines. There are boulders outlining <br />the pond which have filter fabric underneath them. There is also <br />f i 1 1 that has been placed within the flood plain of Lake <br />Minnetonka. <br />There was some discussion on behalf of applicants and the <br />Commission members regarding who was responsibile for the <br />existing drainag- problem. It was determined that Lyman Limber <br />
The URL can be used to link to this page
Your browser does not support the video tag.