Laserfiche WebLink
ZONING FILE NO. 1330 <br />CITY OF ORONO NOTICE OF PLANNING COMMISSION ACTION <br />P.O. Box 66 <br />Crystal Bay, MN 55323 473-7357 Date of Notice: 9/22/88 <br />---------------------------------------------------------------------------- <br />TO: Fullp.---n Properties, Inc. COPIES TO: Mark Gronberg <br />608 &ad Avenue South, i1100 Coffin & Gronberg, Inc. <br />Minneapolis, MN 55402 482 A Tamarack Avenue <br />Attn: Joseph W. Franks Long Lake, MN 55356 <br />TYPE OF APPLICATION: Subdivision <br />----------------------------------------------------------- <br />DATE OF MEETING: 9/19/88 VOTE: 5 For 0 Against <br />Planning Commission recosssends the following: <br />Tabled for reasons noted below <br />NOTES AND SPECIAL CONDITIONS: <br />Planning Commission requested additional information as follows: <br />1. Define a proposed suitable building envelope for each site. Staff <br />interprets this as meaning you should show on the survey the location <br />of one or more potential and feasible house locations for each lot. <br />2. Based on the above, then show that feasible soil types and slopes <br />are available on each property to support septic systems. <br />3. Provide soil boring:, on at least Lots 2, 3, *, and 5 to verify <br />actual soil types. Recal! that discussions at the September 19th <br />meeting, staff suggested that the 1 survey maps and the topography <br />don't match, and areas shown as Hamel loam may in fact be other <br />more suitable soil types for septic system development. Please have <br />your soils consultant contact Mike Gaffron at 473-7357. <br />4. Attached, please find the addendum to the staff memo of September <br />13, 1988 that was transmitted to the Planning Commission at the <br />meeting. Please note the following: <br />A) Although the Planning Commission did not specifically address <br />the issue, Lot 3 should be expanded by 0.1 acres in orl*r that it <br />(and all other lots) contain a minimum of 5.0 acres of dry <br />buildable land. <br />B) Please note the City Engineer's comments in his letter of <br />September 9, 1988, including 28' required paved road width, <br />elimination of entry island, and ditch grading along Tr- line <br />Road. <br />5. Please show , lans for any entry monuments or berming that may be <br />proposed. <br />