My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
10-24-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
9/30/2025 9:11:41 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
10/24/1988
Retention Effective Date
9/30/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The private road shall. be constructed to City private road <br />requirements, subject to a Developer's Agreement to be executed <br />between the City and the developer. Private road construction can <br />begin as soon as the engineering plans for the road have been formally <br />approved by the City and the Developer's Agreement has been executed. <br />5. Zhe private road shall be privately owned and maintained per the <br />appropriate access easement/maintenance documents to be executed by <br />the developer. <br />6. The Standard Road & Utility Easement and Private Road Maintenance <br />Covenants shall be filed with the plat. <br />7. The "island" within the private roadway near the entrance to <br />Townline Road does not meet public road standards. If at some future <br />date this private road becomes a public road, the City reserves the <br />right to have this island removed. <br />8. Private driveway crossings of the Painters Creek drainageway <br />shall be allowed for each of Lots 3 and 4, subject to any permit <br />approval the may be required by the Minnehaha Creek Watershed <br />District. <br />9. A Co.servation & Flowage Easement document shall be executed for <br />the wetlands occuring on Lots 2 and 3, and this easement shall be <br />shown on the plat drawing as a drainage easement. A 50' drainage <br />easement centered on the center line of Painters Creek shall similarly <br />be dedicated on the plat drawings. <br />10. Standard Drainage & Utility Easements shall be shown on the plat <br />along lot lines. <br />11. Payment of standard Park Fees of Si00.00 for each of Lots 1 thru <br />7; Total = $700.00. <br />12. No building permits will be issued until the private road base <br />work has been completed and been approved by the City. <br />The following list of final submittals must be submitted to the "oning <br />Administrator two weeks prior to the regularly scheduled Council meeting on <br />the second and fourth Mondays of the month: <br />1. RECORD PLAT drawings in the form of two (2) mylar copies and one <br />(1) copy reduced to 1"=200' scale. Drawing to include: <br />a) Lot lines platted per preliminary survey by Coffin & Gronberg <br />Inc. attached as Exhibit A hereto. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.