My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
10-24-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
9/30/2025 9:11:41 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
10/24/1988
Retention Effective Date
9/30/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2192 <br />1. Prior to the hauling of fill to the site the applicant or <br />applicant's agent must submit the following: <br />a) Six cross sections of existing topography. <br />b) Final grading and Erosion Control plan designating the <br />following: <br />1) Side slopes 5:1. <br />2) One percent slope to be maintained within inner fill <br />area. <br />3) Silt fence installed 30 to 35 feet from wetland at <br />972 elevation -- no :.and alterations allowed within 26 <br />feet of wetland. <br />4) Average height of fill to be maintained at 5 feet. <br />5) Monitoring plates to be installed as-equired by <br />the City Engineer. <br />c) Executed Developer's Agreement and appropriate security <br />to insure final grading and seeding if fill project is not <br />completed. Letter of Credit must be written for 150 percent <br />of the estin,ated cost of the improvement. <br />2. Fill shall not exceed allowed amount of 100,000 cubic yards. <br />Side slopes shall be seeded as soon as 5:1 slope ratio has been <br />realized. <br />3. Park Constriction shall be responsible for advising t e City <br />of monthly schedule of hauling activities so that staff can <br />arrange an approximate inspection schedule for each month. Prior <br />to hauling any fill to the site Park. Construction must arrange <br />for a preconstruction meeting with the Orono at'#ff to review ail <br />final submittals and tentative hauling schedule. <br />4. Park Construction shall cease all hauling to the site upon <br />evidence of shearing and/or other signs of instability created Ly <br />filling over the former dump sit#*. Applicant shall not proceed <br />with hauling until the City Engineer has had adequate time to <br />review the evidence and submit a written report to the Council <br />for their review and action. If Council determines that it is in <br />the public interest to cease all hrulinq to the site, this <br />conditional use permitshall be to urinated immediately and the <br />applicant shall complete the final grading an,i seeding of the <br />entire disturbed area. <br />5. Authorities granted by this r, solution run with the property <br />net with the owner, but ate permis,ive only and must be completed <br />11 within one year of the date of Coy nci 1 approval or the special <br />conditions of this revolution wi 1 . expire on that date (June Q, <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.