Laserfiche WebLink
Mr. Joe Pallansch <br />Page Two <br />3. The proposal for an interceptor trench is appropriate in this type of <br />hydrogeological regime. However, the proposed depth to which the <br />interception trench will be installed does not appear to be deep enough <br />to intercept the contaminated ground water detected at MW-2D. <br />Modification of this proposal should be considered after a more <br />complete definition of the contaminant plume is attained. <br />If you have questions regarding the above review and comments please contact <br />Joseph Julik (612/296-7753) or Crague Biglow (612/296-9626) of my staff at your <br />earliast convenience. _ <br />Sincerely, <br />•.�_--- <br />L rry C istensen <br />Chief, azardous Waste Section <br />Hazardous Waste Division <br />LC/JKJ : njd <br />