Laserfiche WebLink
May 6, 1988 <br />Metropolitan <br />i50 %ion, Square Building <br />:f t:• <br />I!� <br />Waste Control Commission <br />7111 and R(lhvrl. SI Paul. \lmnc%otj 55101 <br />•v �' 'I! ��' --- mill <br />4 <br />Mr. Jerry Toberman Re: Orono Interceptor Improvements <br />Toberman Enterprises, MWCC Project Number 85-67 <br />Maxwell Bay Marina <br />600 South County Road 18 <br />St. Louis Park, MN 55426 <br />Subject: 4/27/88 Meeting at Maxwell Bay Marine <br />Dear Mr. Toberman: <br />As a result of our April 27, 1938 meeting about the siting of a <br />pumping station for the referenced MWCC project, our consulting en i- <br />r.eers are proceeding with the design. however, I wanted to confirm the <br />specifics with you to verify our previous verbal discussion. <br />The MWCC will move the designed location of a pumping station from the <br />County Road 51 right-of-way onto the far scuthwest corner of your lot <br />to the east of Maxwell Bay Marine in order to cause the least impact <br />to your business investment. Presently, Jerry Goodwin is parking large <br />boats in that. area. In order to accomplish this design change, our <br />engineering consultants have to survey the corner and take one soil <br />boring. <br />As previously discussed, the MWCC will proceed with the ,rope-ty <br />acquisition of approximately 3000 square _`eet as fee title purchase <br />and 1200 square feet as a permanent access easement across the <br />existing gravel goad. The project appraiser, Vince Wharton of McKenzie <br />Metro Appraisals, should be in contact with you in about one month. <br />The MWCC will coordinate the tenant requirements with the project <br />negotiator, Stuart Storm of Von Klug and Associates, Inc. <br />I thanx you for taking the time last week to discuss this issue with <br />us and hope that your wife is doing better after her surgery. <br />Please feel free to call me if you have any questions. 1 have attached <br />the project fact sheet and map for your information. <br />Sincer e <br />W�t <br />Kimberly B. Eckhardt <br />Project Manager <br />KBE:sma <br />KBE-L43 <br />Attachments <br />cc: JoEllen Hurr, MWCC <br />Jeanne Matross, MWCC <br />Jim Rosenberger, MWCC <br />l429 <br />