My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
house plans 2795 Shadywood Rd 3.27.24 (2)
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2795 Shadywood Road - 21-117-23-31-0002
>
Permits/Inspections
>
house plans 2795 Shadywood Rd 3.27.24 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 9:48:07 AM
Creation date
9/26/2025 9:45:47 AM
Metadata
Fields
Template:
Address
Street Name
SHADYWOOD RD
House Number
2795
Address
2795 SHADYWOOD RD
PIN
21-117-23-31-0004
Address Doc Type
Building Plans: Residential
Section
Permits/Inspections
Retention Effective Date
9/5/2025
Retention
1 Year After Project Complete Date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 27, 2024 :: <br />Complete Remodel and Additions for <br />Erik and Marissa Winegarden <br /> Project Address: 2795 Shadywood Rd. Excelsior, MN 55331 <br />Sheet Index on A1 <br />Structural Engineer: Deep Roots EngineeringGeneral Contractor/Plan Design - K&K Builders Interior/Exterior Design - Clove Design Studio <br />Reviewed for Code Compliance <br />Nicole Post <br />RPS24-000048 <br />5-29-24 <br />Additional permits required: <br />Plumbing <br />Mechanical <br />Electrical <br />Stamped and approved plans <br />must be on site for the duration <br />of the project and all <br />inspections. <br />To schedule inspections <br />call: <br /> 952-249-4613 <br />Please have the permit <br />number and street address <br />ready at time of call. <br />Please plan accordingly. The City will not issue a Temporary Certificate of <br />Occupancy (Temp CO) for new homes during the growing season from May <br />1st to November 1st. Issuance of a Certificate of Occupancy requires all <br />permits associated with the project to be finaled and an as-built survey <br />approved by the City. Allow 1 week for as-built approval. If vegetation is not <br />fully established at the time of CO issuance, the erosion control escrow will <br />continue to be held.
The URL can be used to link to this page
Your browser does not support the video tag.