My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1473 Bay Ridge Road - 10-117-23-34-0005
>
Land Use
>
95-2084 VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 2:18:55 PM
Creation date
9/25/2025 2:17:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 6, 1995 <br />Mr. Michael P. Gaffron <br />Assistant Planning & Zoning Administrator <br />City of Orono <br />2750 Kelley Parkway <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />Re: Item #2084 <br />1473 Bay Ridge Road <br />Dear Mr. Gaffron: <br />I appreciated the Planning Commission's approval of my variance application on November 20, <br />1995, which was subject to "not proceeding with the garage wing addition until/unless municipal <br />sewer becomes available to the property." <br />I was just apprised yesterday of the possibility that no building permits would be issued until (1) <br />a "Septic System Upgrade Agreement" is executed, (2) a Letter of Credit is provided, and (3) a <br />conforming septic system design/tests are provided. In view of the fact that the Bayridge <br />neighborhood is in the "Shoreland" area, the fact that 8 property owners in Bayridge have <br />unanimously petitioned for municipal sewer and the high probability that municipal sewer will <br />come to the neighborhood in the very near future, I respectfully request that the above items not <br />be required. <br />It is our intent to immediately apply for a building permit to do interior renovation work to the <br />existing home and add the new sunroom addition, before we occupy the property. If the city <br />council determines that the "Septic System Upgrade Agreement" and Letter of Credit are <br />required now, I will comply. However, to require an alternate septic system (mound system) <br />design would be costly (and probably academic in view of municipal sewer) and the soil <br />percolation tests would be impossible at this time due to frozen ground. <br />Therefore, to delay a building permit until "perc" tests could be done in the spring would be a <br />major hardship and we would have to find alternative housing until the remodeling is completed. <br />I believe Steve Weckman and you would agree that the large size and flatness of the lot would, <br />in all probability, provide an acceptable site for an alternative system, if necessary. <br />Thanks for your cooperation. <br />Sincerel , <br />Thomas R. McCune <br />
The URL can be used to link to this page
Your browser does not support the video tag.