My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1473 Bay Ridge Road - 10-117-23-34-0005
>
Land Use
>
11-3505 VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 2:12:27 PM
Creation date
9/25/2025 2:11:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COAUMSSION MEETING <br />Monday, May 16, 2011 <br />6:30 o'clock p.m. <br />McCune pointed out there are two or three other homes in the neighborhood that encroach closer to the <br />property line than his house. McCune stated he would like to fix an ice dam problem with this project. <br />Chair Schoenzeit opened the public hearing at 8:15 p.m. <br />There were no public comments concerning this application. <br />Chair Schoenzeit closed the public hearing at 8:15 p.m. <br />Thiesse moved, Levang seconded, to recommend approval of Application 011-3505, Thomas and <br />Martha McCune,1473 Bay Ridge Road, granting of side setback variances. VOTE: Ayes 6, <br />Nays 0. <br />5. 11-3506 ORONO PUBLIC SCHOOLS, 685.OLD CRYSTAL BAY ROAD NORTH, <br />CONDITIONAL USE PERMIT, 8:16 P.M. — 8:21 P.M. <br />Curtis stated the Orono Public School intends to construct a new softball field area;and is requesting a <br />CUP in order to conduct filling and grading activity on the propel:..: <br />The Orono Schools intend to improve an area of:ahe southernmost property on campus for a new softball <br />field. As a result of the City's Old Crystal Bay Rproject, there will be soil material exported out of <br />the roadway area. The school would like to Mize tie "ss materia1 to improve the grade to prepare for <br />the new softball field. Due to.tlte amount of malcrial proposed,, a conditional use permit is required. <br />Planning Staff recommo�4ds approval,of the CUP. A11 of the City Engineer's requirements, including <br />erosion control measures, 1- :ll be addressed with the administrative land alteration permit following CUP <br />approval. <br />Schoenze�6�d � tltiieir,approval 4uld not be contingent on the road project. <br />Curtis iod ated that would'be appropriate; <br />John Osland, 6C0no Schools, indicated he is here to answer any questions the Planning Commission may <br />have. The scho4i- Wtempting to pttt in a new ball field. The school removed two ball fields last year <br />and they are commi{d:to construcg a new field. This field likely will be a junior varsity girls field <br />and it will need to be cl a in the near future. <br />Once the school learned then �uld be excess materials from the road project, they felt this would be a <br />great opportunity to construct the ball field. Osland noted the school will not be accepting any <br />contaminated soils. <br />Chair Schoenzeit opened the public hearing at 8:18 p.m. <br />There were no public comments regarding this application. <br />Chair Schoenzeit closed the public hearing at 8:18 p.m. <br />Page <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.