Laserfiche WebLink
Apr 2011 09:47a Pelican Bay Pack & Ship <br />939-325-8534 <br />PC Exhibit A <br />City of Orono # 3 5 0 <br />Variance Application <br />Strwf Address: <br />2750 Kelley Parkway <br />Orono, MIN 55356 <br />Main: 952-249-4600 <br />fax: 952 249-4616 <br />Marling Address: <br />P.O. Box 66 <br />Crystal Bay, MN 55323-MM <br />Application # J1 3 6-0-5- <br />Date Received: yl <br />Staff : <br />Fee: $700 <br />Renewal: $350 <br />After -the -fact: $1,400 Double Fee <br />Escrow Fee: $6001$2,500 <br />This application form must be completed in full. Applicant will be notified within 96 days as to the status of the <br />application. Incomplete applications will not be placed on Planning Commission Agendas. <br />PROPERTY INFORMATION: <br />Site Address: 6-• i' .k Lf(L 3 t <br />Property Identification Num PI ): v n2-'g45605 <br />Date Property Acquired (monthlyear): 19� ❑ Yes, I awn he adjacent parcels. <br />Zoning District: _ <br />APPLICANT INFOR ON: {Com leis legal nai <br />Name: S t• (�k c <br />Phone (home): <br />Complete Address: <br />City, State & ZIP <br />Email I: -h') An G Lf-A? (9L M., 4 <br />OWNER INFORMATION: (Comple egat names <br />Name: ru 'l� e.uutr I1fPrlrr�i r, <br />Phone (home): _r <br />Complete Address:W7 4- <br />City, State & ZIP 55 <br />Email: 4� n>,r, ill Al�_�.,� <br />and marital status required for each interested party) <br />}.l C, <br />Phone (work): - D <br />marital us re uired for each intereste partyj� <br />o r a CL g.IV Ll to 6FLc <br />Ph a (work):Ge el <br />Fax: <br />DESCRIPTION OF REQUEST: <br />Describe the request in detail (attach additional sheets if necessary): <br />The existing center portion of our home is a 65 It x 26 ft, SQ year old rambler. The roof structure <br />is simply 2x8 roof rafters with sheetrock on the bottom, 6 inches of insulation in the non - <br />ventilated cavity and US boards & shingles on top. We experience significant ice dams and <br />some water infiltration in this area. As a corrective measure, we propose to install new, low <br />profile trusses to allow for additional insulation and space to ventilate the roof. This ridge in this <br />area will be raised approximately 35 inches and will be about 8 inches higher than the ridges of <br />the additions added in the mid 1990's. None of the work will be outside the footprint of the <br />existing roof, which was constructed in 1960. This roof is partially in the current 30 ft side <br />setback on the north and south sides of the 100 ft wide lot. The sole purpose of this project is to <br />irnnrnvn rnnf inci latlnn and rnnff uantilatinn <br />