My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4915
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4900 - 4999 (November 25,2002 - June 23,2003)
>
Resolution 4915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 1:02:31 PM
Creation date
11/13/2015 1:02:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
II. Sewer and Water Connection Charges (SWCC) <br /> • Fee Calculation Based on Ordinance: <br /> 1. Sanitary Sewer Connection Charges <br /> ' 1989 Highway 12 Area................................. $5,320.00 per acre <br /> Residential Portion: 41.55 acres x$5,320.00/acre=$221,046 � <br /> Commercial Portion: 9.90 acres x$5,320.00/acre= $ 52,668 <br /> 2. Municipal Water Connection Charge <br /> 1989 Highway 12 Area................................. $8,795.00 per acre <br /> Residential Portion: 41.55 acres x$8,795.00/acre=$365,432 <br /> Commercial Portion: 9.90 acres x$8,795.00/acre=$ 87,070 � � <br /> Residential Total SWCC=$221,046+$363,432=$584,478 <br /> Commercial Total SWCC=$52,668 +$87,070=$139,738 <br /> Phasina � <br /> A. Residential. Sewer and Water Connection Charges (SWCC) shall be converted to a `per <br /> unit'basis for purposes of collection prior to commencement of each Phase per the following <br /> formula: � <br /> Number of dwelling units in Phase <br /> $584,478 x -----_�____________ =SWCC Due Prior to Commencement of Phase <br /> 162 � <br /> • B. Commercial. Proration: If Outlots A and D are not developed at the same time,the acreage of the <br /> outlot being developed divided by the total acreage of both outlots shall determine the fraction of . <br /> the total Commercial SWCC due . <br /> III. Storm Water& Drainage Trunk Fee <br /> � Fee Calculation Based on Ordinance: <br /> Multi-Family: 4 or fewer Units/Acre........................ $4,860.00 per acre <br /> Multi-Family: Greater than 4 Units/Acre.................. $5,670.00 per acre <br /> Commercial: ..............................................:.............. $6,480.00 per acre <br /> Residential SW&DT Fee: 41.55 acres @ 6�units/acre=41.55 x$5,670=$235,600 <br /> Commercial SW&DT Fee: 9.90 acres x$6,480.00/acre=$64,152 � <br /> Phasin� . <br /> A. Residential. Proration: The number of dwelling units within each Phase divided by the total <br /> number of units within all Phases shall determine the fraction of the total SW&DT fee due <br /> for each Phase. <br /> • B. Commercial. Proration: If Outlots A and D are not developed at the same time,the acreage of the <br /> outlot being developed divided by the total acreage of both outlots shall deternune the fraction of <br /> the total Commercial SW&DT fee due. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.