Laserfiche WebLink
City Of Orono <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br />Property Address: <br />PID: <br />Owner Information <br />Name: <br />Mailing Address: <br />(if different from <br />Property) <br />Phone: Email: <br />Inspector Information <br />Name: <br />Company/ Organization License number: <br />Phone: Email: <br />Inspection <br />System Standard Pass Fail <br />Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br />Foundation <br />Drains <br />Foundation drains are underground pipes that collect storm water from <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building . Foundation drains should no t be connected <br />to the sanitary sewer. <br />Sump Pumps Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service <br />Line <br />Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. (Details on back of this sheet) <br />Notes: <br />Toilet Removed <br />For Inspection: <br />○Yes ○ No <br />Inspectors Signature: Date: <br />Owners Signature: Date: <br />City Review <br />Compliant Corrective Action Required <br />Certificate of Compliance Expires: Corrective Action Due by: <br />Date: Signature: <br />Name: <br />Date Called in <br />Date Scheduled <br />City of Orono <br />952-249-4686 <br />Heather Smieja <br />1310 Vine Place, Orono, MN 55364 <br />0711723420001 <br />Jimmy Nelson <br /> 9/19/2025 - Replaced 2' of 4" clay with 4" PVC sch 40. Reconnected it to 4" clay tile. 13' <br />deep on left side of the driveway. Ouverson lined roughly 102' of pipe <br />9-19-2035 <br />9-24-2025