My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-07-09 Septic System Approval
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
760 Dickey Lake Drive - 27-118-23-33-0009
>
Septic
>
1993-07-09 Septic System Approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 3:09:11 PM
Creation date
9/18/2025 3:05:36 PM
Metadata
Fields
Template:
x Address Old
House Number
760
Street Name
Dickey Lake
Street Type
Drive
Address
760 Dickey Lake Drive
PIN
2711823330009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4� CITY OF ORONO <br />I SYSTEM APPROVAL <br />A' of ORONO <br />•3r �, `' ;;1' Mu*kw Dram <br />PM Office Box K <br />LOCATION: 760 Dickey Lake Dr. <br />OWNER: <br />GENERAL CONTRACTOR: Cheyenne Builders SEPTIC CONTRACTOR: <br />SITE EVALUATOR: Otto & Associates REPORT DATE: June 24. 1993, revised July 7 <br />The City of Orono has Approved <br />(approved -disapproved) <br />your on -site system design as of July 9, 1993 <br />(date) <br />with the following comments: The grading and drainage plan shows that considerable amounts <br />of water will be directed over the septic tanks. Therefore, the tank location may <br />need to be moved further west to allow surface drainage to flow east of the tanks. <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br />of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long term use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CITY OF RONO <br />Stephen ckman, On -site Systems Manager <br />TFX EPHONF. - 473-7357 . FAX - 473-W IO <br />
The URL can be used to link to this page
Your browser does not support the video tag.