Laserfiche WebLink
PUMP AND COLLECTION TANK: <br />A pump shall be used to deliver effluent to the mound. The hump shall be cast iron or bronze <br />fitted with stainless steel screws or constructed of other sound, durable and corrosion resistw'! <br />aterials. <br />The pump installed will need to deliver 42 gallons per minute with a head of at least 31 feet. <br />An alarm device shall be installed to warn of ;.)ump failure. Install the pump control and a <br />Meyers, Model D.L.V. Audio Visual, Lo-Voltage alarm system or approved equal ir, a <br />conspicuous glace at the direction of the owner. <br />Dosing Volume = 25% of 750 g.p.d. 187.5 gallon. <br />ANFIELD F OCK REQUIRED: <br />! d on 1 inches of rock, 28 cubic y.uds of rock would be required. <br />Sr.ND REQUIRED: <br />Approximately 219 cubic yards of clean sand for under mound is needed. <br />DIKE WIDTH & LENGTH: SEE E-5 <br />BASAL SIZE OF MOUND: SEE E-19 <br />NOTES: <br />A. Please sec site; plan layout. <br />B. Typical sections for construction follow. <br />C-7 <br />E-3&4 <br />E-6 <br />E-12 <br />F-7 <br />PAGE jr <br />