My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-06-24 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
760 Dickey Lake Drive - 27-118-23-33-0009
>
Septic
>
1993-06-24 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 3:09:11 PM
Creation date
9/18/2025 3:00:56 PM
Metadata
Fields
Template:
x Address Old
House Number
760
Street Name
Dickey Lake
Street Type
Drive
Address
760 Dickey Lake Drive
PIN
2711823330009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br />SITE EVALUATION REPORT <br />For Cheyenne Builders <br />Sewage Treatment System <br />General Information <br />This design is for a Type 1, 5 bedroom home and in accordance with the Minnesota Pollution <br />Control Agency Standards and local ordinances. <br />A seasonally high water table was evidenced at 18 inches of depth in Soil Borings 3, 4, 5 & 6. <br />The slope is about 4%. <br />The soils at a depth of 12 in Test Holes 5 thru 7 have a percolation rate of 34 minutes per inch. <br />All neighboring wells are located more than 100' away from the proposed treatment area. <br />NOTES: <br />Keep all heavy equipment off the proposed treatment area before and after construction <br />as much as possible. The treatment area should be marked off before construction. <br />With proper installation and maintenance this system should have no problem in treating <br />septic effluent effectively. <br />It is recommended that the septic tanks be pumped every 2 years. <br />MOUND SYSTEM: <br />Flow: 5 bedroom = 150 gallon/day/bedroom 150 x 5 = 750 gallons per day. <br />750 GPD x 1.00 = 750 square feet. <br />10-foot wide rock bed 75 feet long = 750 square feet <br />CONSTRUCTION EQUIPMENT: <br />A rubber -tired tractor may be used for plowing or disking to prepare the soil surface but in no <br />case shall a rubber -tired tractor be used after the surface preparation is completed. A crawler <br />or tract -type tractor shall be used for mound construction. <br />SOIL SURFACE PREPARATION: <br />The discharge pipe from the pump to the mound area shall be installed prior to soil surface <br />preparation. The trench excavated to install the discharge pipe shall be carefully backfilled and <br />compacted to prevent seepage of effluent. <br />PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.