Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, March 19, 2007 <br />6:00 o'clock p.m. <br />(#07-3266 Vogue ICF Homes, Continued) <br />Turner noted the height numbers were determined from the existing grade and that two feet of fill would <br />be brought in to raise the floor, which would be counted against the height. Turner stated the peak <br />height would be 3 8 feet and the average height would be 34.5 feet by measuring halfway between the <br />peak of the roof and the top of the windows. <br />George Stickney, Orono, inquired what the total hardcover is on the property, including the 0-75 foot <br />zone. Stickney indicated he is not opposed to some variances for this property but that he has a concern <br />with the height of the structure . <br />.., ..... <br />Hahn stated the middle of the roof is at 30 feet. <br />Zullo commented the concern deals with the overall project and the amount of total massing on the <br />property as well as the height of the structure. Zullo stated she is not supportive of the project based on <br />those two concerns. <br />Acting Chair Kempf closed the public hearing at 8:24 p.m. <br />Kang expressed a concern with the hardcover and the height, and encouraged the applicants to design a <br />smaller house in an effort to reduce the hardcover on the lot. <br />Kempf noted the total hardcover for the lot is 3265 square feet. Kempf recommended the hardcover be <br />reduced to below 3000 square feet. Kempf suggested the applicants consider constructing the third stall <br />to be accessed through the double garage door. <br />Vogstrom indicated they are willing to redesign the house to better conform to the recommendations of <br />the Planning Commission. <br />Kempf stated he appreciates the indentations designed into the house to help break up the appearance of <br />massing on the lot but that the two dormers on each side of the house appear to be rather large. <br />Hahn stated the dorn1ers are merely decorative and could be reduced. <br />Berg commented the dormers tend to contribute to the overall massing on the lot. Berg rec01m11ended <br />the applicant work with Staff on redesigning his plans. <br />Winer noted page three of the report states the house would be constructed on pilings and that the house <br />must comply with the regulatory flood protection elevation. <br />Turner stated a floodplain variance is one of the requests the applicants are making because if they were <br />required to meet that standard, the house could only be approximately 15 feet wide. <br />Winer stated in her opinion there is going to be flooding in this area. <br />PAGE17