My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Submittal
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1400 Baldur Park Road - 08-117-23-31-0001
>
Land Use
>
15-3773, CUP
>
Submittal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 10:34:15 AM
Creation date
9/18/2025 10:32:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control Supplemental Information <br />Final Stabilization will be provided with (seed, sod, etc): -~..SC~at>~------- <br />and 6 inches of topsoil will be added/replaced prior to final stabilization. <br />Concrete Washout: Location of concrete washout <br />Off site = Indicated on site plans _ Other ( description): _}( Contained on truck: <br />Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br />from the drip line or critical root zone, whichever is greater, of all vegetation to be retained. <br />)(Yes _ Not Applicable _ Other (description): <br />Inspections: An erosion control inspection plan is required for all projects disturbing ¼ acre or <br />greater. The inspection requirements are as follows: <br />I) The individual identified as being responsible for implementing the erosion control <br />plan must routinely inspect the construction site once every seven days during active <br />construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br />hours. <br />2) All inspections and maintenance conducted during construction must be recorded in <br />writing and these records must be retained with the erosion control plan and made <br />available at the District's request within 24 hours. Records of each-inspection and <br />maintenance activiry shall include: <br />i. Date and time of inspections; <br />ii. Name of person conducting inspections; <br />iii. Findings of inspections, including recommendations for corrective actions; <br />iv. Corrective actions taken (including dates, times and parry completing <br />maintenance activities); and <br />v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br />Provide the following information for the primary individual responsible for implementing the erosion <br />control plan: <br />Name <br />Organization ___________________________ _ <br />3C8 . . <br />Phone &/Z. IJfJ,J I Z.':R:O Alternate Phone 9SZ. 9 ZZ -6&.3 Z <br />Email <br />I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br />proposed activity will be conducted in compliance with this rule. <br />,5-c::::£ <br />Signature of Applicant or Authorized Agent <br />,,,-, <br />Z/ ,:/1.10/ ZOIS <br />Date <br />RECEIVED <br />AUG O:l 2015 ~377~
The URL can be used to link to this page
Your browser does not support the video tag.