Laserfiche WebLink
(11) Placement of natural rock riprap, including associated grading of the shoreline and placement of <br />a filter blanket, is permitted if the finished slope does not exceed three feet horizontal to one foot <br />vertical, the landward extent of the riprap is within ten feet of the ordinary high water level, and <br />the height of the riprap above the ordinary high water level does not exceed three feet. A riprap <br />permit shall be obtained per the requirements of section 78-969. <br />(f) Excavations where the intended purpose is connection to a public water, such as boat slips, canals, <br />lagoons and harbors, are prohibited above the ordinary high water level. Such excavations below the <br />elevation or the ordinary high water level are subject to approval of the department of natural resources <br />and other agencies with concurrent jurisdiction. <br />(Ord. No. 101 2nd series,§ 1(10.56(16)(J)), 2-24-1992; Ord. No. 127 2nd series,§ 8, 7-11-1994; <br />Ord. No. 163 2nd series,§ 3, 12-8-1997; Ord. No. 171 2nd series,§ 2, 4-4-1998; Ord. No. 28 3rd <br />series,§ 17, 8-22-2005; Ord. No. 133 3rd series,§§ 2, 3, 1-26-2015) <br />Page 6