|
GRADING, DRAINAGE AND EROSION CONTROL PLAN
<br />Call 48 Hours
<br />GOPHER STA
<br />Council
<br />Exhibit B
<br />Twin Cities Area 651-454-0002
<br />MN. Toll Free 1-800-252-1166 _,,, ~ / / ---------Co· / 0)0 / ,. ,. jl396 <::{ / :'\· rr, / I" EXJSTING HOUSE 0)0 I ----/ <::{ -------I / ro· I / O)r>j
<br />I / /
<br />I / /
<br />I /
<br />/
<br />I
<br />I
<br />/
<br />/ I
<br />/ I
<br />I
<br />I
<br />I
<br />I
<br />' ......
<br />\
<br />I 0 20 I
<br />~IN FEET
<br />40
<br />I I.
<br />0
<br />LEGEND
<br />DENOTES FOUND PROPERTY IRON
<br />DENOTES SET 1 /2" X 18" REBAR
<br />WITH PLASTIC CAP "PLS 25105" / Jc,.b.\ I
<br />/ NKA'---) >/= 9/ / /
<br />I I /'
<br />----DENOTES BOUNDARY LINE
<br />-DENOTES LOT LINE
<br />I I " ARM)1
<br />------DENOTES SETBACK LINE
<br />I \
<br />I
<br />,,,. -999 --DENOTES EXISTING CONTOUR LINE
<br />x999.99 DENOTES EXISTING SPOT ELEVATION
<br />/ I
<br />/
<br />--931.0--✓ ---19. pc Q DENOTES CONCRETE SURFACE
<br />-+--DENOTES DRAINAGE FLOW
<br />I
<br />I
<br />I
<br />I L ____ _
<br />~~
<br />2.22% --I
<br />I
<br />I
<br />\
<br />\
<br />~
<br />Q
<br />~
<br />0
<br />El
<br />2
<br />'--" OJ.
<br />OJ
<br />0)
<br />"1-
<br />.-
<br />\
<br />\
<br />RECEIVED
<br />AUG 1 0 2015
<br />CITY OF ORONO
<br />FFE DENOTES FINISH FLOOR ELEVATION
<br />0 DENOTES DECIDUOUS TREE
<br />--o--DENOTES WIRE FENCE
<br />--□--DENOTES WOOD FENCE
<br />-OE--DENOTES OVERHEAD ELECTRIC
<br />CU.., DENOTES ELECTRIC POWER POLE
<br />E--DENOTES GUY ANCHOR
<br />@ DENOTES MANHOLE
<br />DENOTES RETAINING WALL
<br />---fJ--E3-0E} DENOTES SILT FENCE
<br />I xxx.x I DENOTES PROPOSED GRADE
<br />,...--@])-DENOTES PROPOSED CONTOUR
<br />SEDIMENT & EROSION CONTROL NOTES
<br />/
<br />I
<br />I
<br />/ ► 1.0% I
<br />I
<br />I
<br />\.
<br />9 301. ALL EXPOSED SOIL AREA, INCLUDING TEMPORARY STOCKPILES, MUST BE
<br />;---..,.. STABILIZED AS SOON AS POSSIBLE BUT IN NO CASE LATER THAN 14 DAYS AFTER
<br />,,,-✓ ..---f:::"<:::'"s::--s:-'""'...,,,--.,......._ -
<br />/ --10.22-=-
<br />' I "< "'--", \' '\ , .... ' \
<br />I
<br />------------
<br />#1404
<br />EXISTING HOUSE
<br />r-..
<br />I--<.
<br />L ✓
<br />...... ...... ...... ......
<br />' A~ :) c{!J\· /
<br />ORDINARY HIGbl_,,
<br />WATER LINE;// 929.4
<br />I
<br />I
<br />I
<br />.;11 / ,_,, /•
<br />/
<br />----------I
<br />I
<br />NUMBERED NOTES
<br />~ INSTALL SILT SOCK FENCE TO START OF SOIL DISTURBING
<br />ACTIVITIES.
<br />~ INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PRIOR TO
<br />START OF SOIL DISTURBING ACTIVITIES.
<br />..,_......,IN,_STALL TEMPORARY CONCRETE WASHOUT PAD OPTIONAL .
<br />-----------
<br />HARDCOVER
<br />BUILDING SETBACKS
<br />ZONING: LR-1C = ONE-FAMILY LAKESHORE
<br />HOUSE: FRONT = 30 FT
<br />SIDE = 10 FT
<br />REAR (OHW) = 75 FT REFERENCE BENCHMARK
<br />EXISTING IMPERVIOUS SURF ACES
<br />PROPOSED IMPERVIOUS SURF AC ES
<br />TOTAL LOT AREA
<br />3,292 SQ. FT. ELEVATION = 931.76 @ SEWER MANHOLE
<br />3,100 SO. FT. RIM AT 1392 BALDUR PARK RD.
<br />12,308 SQ. FT.
<br />EXISTING HARDCOVER
<br />PROPOSED HARDCOVER
<br />27 % LEGAL DESCRIPTION
<br />25 %
<br />Lot 15, Block 1, BALDUR PARK,
<br />Hennepin County, Minnesota
<br />ENGINEERING DESIGN & SURVEYING I HEREBY CERTIFY THAT THIS SURVEY WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION,
<br />AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. JOB NAME: STEVE EWOTT
<br />. QC CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR
<br />· PERMANENTLY CEASED. STABILIZE WITH TEMPORARY SEED AND STRAW MULCH
<br />· APPLIED AT 2 TONS PER ACRES .
<br />I 2. SILT FENCE SHALL BE INSTALLED AND AT THE LOCATIONS SHOWN ON THE PLAN .yc(. AND AROUND ANY STOCKPILES. SILT FENCE SHALL BE INSPECTED AND MAINTINED
<br />\ WEEKLY (AND WITHIN 24 HRS OF A 0.5" RAINFALL) UNTIL FINAL SEEDING AND
<br />MULCHING (OR SODDING) OF LOT.
<br />3. DUST CONTROL IS THE RESPONSIBILITY OF THE PERMIT HOLDER. THE PERMIT
<br />HOLDER MUST ELIMINATE DUST PROBLEMS UPON RECEIVING NOTICE FROM THE
<br />BUILDING OFFICIAL THAT THERE IS A DUST PROBLEM.
<br />4. STREET CLEANING SHALL OCCUR DAILY OR AS NEEDED.
<br />·· 5. BILL BRUEGGEMAN (612.308.2500) IS RESPONSIBLE FOR THE CLEANLINESS OF THE
<br />SITE AND THE MAINTENANCE OF THE EROSION AND SEDIMENT CONTROLS.
<br />6. THE STOCKPILE LOCATION SHALL BE AT THE SOUTHEAST CORNER OF THE LOT
<br />(SET BACK 20' FROM FRONT PROPERTY LINE).
<br />7. SITE ACCESS SHALL BE VIA A ROCK CONSTRUCTION ENTRANCE AT PROPOSED
<br />DRIVEWAY. TO THE EXTENT PRACTICABLE, HEAVY EQUIPMENT AND TRUCKS SHALL
<br />BE PROHIBITED FROM PARKING OUTSIDE OF THE GRAVEL PAD AT SITE ACCESS.
<br />8. AS IS PRACTICABLE, BUILDER TO MAINTAIN CONTINUOUS SILT FENCE ACROSS TH
<br />SITE ACCESS WHEN NOT IN USE.
<br />9. IN THE CASE OF PUMPED DISCHARGE, CONTRACTOR MUST FILTER ANY TURBID
<br />WATER THROUGH SAND AND SILT FENCE BEFORE DISCHARGING TO STREET. iNLE
<br />PROTECTION MUST BE IN PLACE.
<br />10. EROSION AI\ID SEDIMENT CONTROL BMPS SHOULD BE INSTALLED AND INSPECTE
<br />BY THE CITY PRIOR TO ANY LAND DISTURBING ACTIVITIES. THE CONTRACTOR
<br />MUST PROVIDE A MINIMUM 24 HOUR NOTICE PRIOR TO INSPECTION.
<br />1 11/01/13 MEET NEW REQUIREMENTS
<br />NO. DA TE DESCRIPTION
<br />FIELD WORK DATE: 02/19/13 DRAWN BY: EP PROJECT NO.:
<br />6480 Wayzata Blvd. Minneapolis, MN 55426 , //; J r. .
<br />OFFICE: 763 545-2800 FAX: (763) 545-2801 • tu. ;)l,.l'Uvf'.-'( DATED: 8 10 2015 t-t:::::!5i:.l~E~~=~~~~?~~~~~~~:l~o:::::::~~;;;~;;;:;;~=~:;:;;:::i;;~;;;~;~~;:f;~~;~;;:~~;~~=~~~~r-EMAIL: info@edsmn.com WEBSITE: http:/ /eds=m~n~.co-m--~--------VLA-DIM-"-IR_S_IVR_I_VE_R-L.-S.-N;_0."-2""'51'-"05-----'"-"-"'""'-.=,..;.;==------ORONO, MN 55391
|