Laserfiche WebLink
GRADING, DRAINAGE AND EROSION CONTROL PLAN <br />Call 48 Hours <br />GOPHER STA <br />Council <br />Exhibit B <br />Twin Cities Area 651-454-0002 <br />MN. Toll Free 1-800-252-1166 _,,, ~ / / ---------Co· / 0)0 / ,. ,. jl396 <::{ / :'\· rr, / I" EXJSTING HOUSE 0)0 I ----/ <::{ -------I / ro· I / O)r>j <br />I / / <br />I / / <br />I / <br />/ <br />I <br />I <br />/ <br />/ I <br />/ I <br />I <br />I <br />I <br />I <br />' ...... <br />\ <br />I 0 20 I <br />~IN FEET <br />40 <br />I I. <br />0 <br />LEGEND <br />DENOTES FOUND PROPERTY IRON <br />DENOTES SET 1 /2" X 18" REBAR <br />WITH PLASTIC CAP "PLS 25105" / Jc,.b.\ I <br />/ NKA'---) >/= 9/ / / <br />I I /' <br />----DENOTES BOUNDARY LINE <br />-DENOTES LOT LINE <br />I I " ARM)1 <br />------DENOTES SETBACK LINE <br />I \ <br />I <br />,,,. -999 --DENOTES EXISTING CONTOUR LINE <br />x999.99 DENOTES EXISTING SPOT ELEVATION <br />/ I <br />/ <br />--931.0--✓ ---19. pc Q DENOTES CONCRETE SURFACE <br />-+--DENOTES DRAINAGE FLOW <br />I <br />I <br />I <br />I L ____ _ <br />~~ <br />2.22% --I <br />I <br />I <br />\ <br />\ <br />~ <br />Q <br />~ <br />0 <br />El <br />2 <br />'--" OJ. <br />OJ <br />0) <br />"1- <br />.- <br />\ <br />\ <br />RECEIVED <br />AUG 1 0 2015 <br />CITY OF ORONO <br />FFE DENOTES FINISH FLOOR ELEVATION <br />0 DENOTES DECIDUOUS TREE <br />--o--DENOTES WIRE FENCE <br />--□--DENOTES WOOD FENCE <br />-OE--DENOTES OVERHEAD ELECTRIC <br />CU.., DENOTES ELECTRIC POWER POLE <br />E--DENOTES GUY ANCHOR <br />@ DENOTES MANHOLE <br />DENOTES RETAINING WALL <br />---fJ--E3-0E} DENOTES SILT FENCE <br />I xxx.x I DENOTES PROPOSED GRADE <br />,...--@])-DENOTES PROPOSED CONTOUR <br />SEDIMENT & EROSION CONTROL NOTES <br />/ <br />I <br />I <br />/ ► 1.0% I <br />I <br />I <br />\. <br />9 301. ALL EXPOSED SOIL AREA, INCLUDING TEMPORARY STOCKPILES, MUST BE <br />;---..,.. STABILIZED AS SOON AS POSSIBLE BUT IN NO CASE LATER THAN 14 DAYS AFTER <br />,,,-✓ ..---f:::"<:::'"s::--s:-'""'...,,,--.,......._ - <br />/ --10.22-=- <br />' I "< "'--", \' '\ , .... ' \ <br />I <br />------------ <br />#1404 <br />EXISTING HOUSE <br />r-.. <br />I--<. <br />L ✓ <br />...... ...... ...... ...... <br />' A~ :) c{!J\· / <br />ORDINARY HIGbl_,, <br />WATER LINE;// 929.4 <br />I <br />I <br />I <br />.;11 / ,_,, /• <br />/ <br />----------I <br />I <br />NUMBERED NOTES <br />~ INSTALL SILT SOCK FENCE TO START OF SOIL DISTURBING <br />ACTIVITIES. <br />~ INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PRIOR TO <br />START OF SOIL DISTURBING ACTIVITIES. <br />..,_......,IN,_STALL TEMPORARY CONCRETE WASHOUT PAD OPTIONAL . <br />----------- <br />HARDCOVER <br />BUILDING SETBACKS <br />ZONING: LR-1C = ONE-FAMILY LAKESHORE <br />HOUSE: FRONT = 30 FT <br />SIDE = 10 FT <br />REAR (OHW) = 75 FT REFERENCE BENCHMARK <br />EXISTING IMPERVIOUS SURF ACES <br />PROPOSED IMPERVIOUS SURF AC ES <br />TOTAL LOT AREA <br />3,292 SQ. FT. ELEVATION = 931.76 @ SEWER MANHOLE <br />3,100 SO. FT. RIM AT 1392 BALDUR PARK RD. <br />12,308 SQ. FT. <br />EXISTING HARDCOVER <br />PROPOSED HARDCOVER <br />27 % LEGAL DESCRIPTION <br />25 % <br />Lot 15, Block 1, BALDUR PARK, <br />Hennepin County, Minnesota <br />ENGINEERING DESIGN & SURVEYING I HEREBY CERTIFY THAT THIS SURVEY WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, <br />AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. JOB NAME: STEVE EWOTT <br />. QC CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR <br />· PERMANENTLY CEASED. STABILIZE WITH TEMPORARY SEED AND STRAW MULCH <br />· APPLIED AT 2 TONS PER ACRES . <br />I 2. SILT FENCE SHALL BE INSTALLED AND AT THE LOCATIONS SHOWN ON THE PLAN .yc(. AND AROUND ANY STOCKPILES. SILT FENCE SHALL BE INSPECTED AND MAINTINED <br />\ WEEKLY (AND WITHIN 24 HRS OF A 0.5" RAINFALL) UNTIL FINAL SEEDING AND <br />MULCHING (OR SODDING) OF LOT. <br />3. DUST CONTROL IS THE RESPONSIBILITY OF THE PERMIT HOLDER. THE PERMIT <br />HOLDER MUST ELIMINATE DUST PROBLEMS UPON RECEIVING NOTICE FROM THE <br />BUILDING OFFICIAL THAT THERE IS A DUST PROBLEM. <br />4. STREET CLEANING SHALL OCCUR DAILY OR AS NEEDED. <br />·· 5. BILL BRUEGGEMAN (612.308.2500) IS RESPONSIBLE FOR THE CLEANLINESS OF THE <br />SITE AND THE MAINTENANCE OF THE EROSION AND SEDIMENT CONTROLS. <br />6. THE STOCKPILE LOCATION SHALL BE AT THE SOUTHEAST CORNER OF THE LOT <br />(SET BACK 20' FROM FRONT PROPERTY LINE). <br />7. SITE ACCESS SHALL BE VIA A ROCK CONSTRUCTION ENTRANCE AT PROPOSED <br />DRIVEWAY. TO THE EXTENT PRACTICABLE, HEAVY EQUIPMENT AND TRUCKS SHALL <br />BE PROHIBITED FROM PARKING OUTSIDE OF THE GRAVEL PAD AT SITE ACCESS. <br />8. AS IS PRACTICABLE, BUILDER TO MAINTAIN CONTINUOUS SILT FENCE ACROSS TH <br />SITE ACCESS WHEN NOT IN USE. <br />9. IN THE CASE OF PUMPED DISCHARGE, CONTRACTOR MUST FILTER ANY TURBID <br />WATER THROUGH SAND AND SILT FENCE BEFORE DISCHARGING TO STREET. iNLE <br />PROTECTION MUST BE IN PLACE. <br />10. EROSION AI\ID SEDIMENT CONTROL BMPS SHOULD BE INSTALLED AND INSPECTE <br />BY THE CITY PRIOR TO ANY LAND DISTURBING ACTIVITIES. THE CONTRACTOR <br />MUST PROVIDE A MINIMUM 24 HOUR NOTICE PRIOR TO INSPECTION. <br />1 11/01/13 MEET NEW REQUIREMENTS <br />NO. DA TE DESCRIPTION <br />FIELD WORK DATE: 02/19/13 DRAWN BY: EP PROJECT NO.: <br />6480 Wayzata Blvd. Minneapolis, MN 55426 , //; J r. . <br />OFFICE: 763 545-2800 FAX: (763) 545-2801 • tu. ;)l,.l'Uvf'.-'( DATED: 8 10 2015 t-t:::::!5i:.l~E~~=~~~~?~~~~~~~:l~o:::::::~~;;;~;;;:;;~=~:;:;;:::i;;~;;;~;~~;:f;~~;~;;:~~;~~=~~~~r-EMAIL: info@edsmn.com WEBSITE: http:/ /eds=m~n~.co-m--~--------VLA-DIM-"-IR_S_IVR_I_VE_R-L.-S.-N;_0."-2""'51'-"05-----'"-"-"'""'-.=,..;.;==------ORONO, MN 55391