Laserfiche WebLink
GRADING, DRAINAGE AND EROSIOi'1 CONTROL P:LAN <br />Call 48 Hours before digging <br />GOPHER STA~E ONE CALL <br />Twin Cities Area 651-454-0002 <br />MN. Toll Free 1-800-252-1166 '-'-\ <br />,II,, <br />Ir, <br />IV ---- <br />2.22% -I <br />I <br />I <br />\ <br />\ <br />. '' ''...-'--"---"" <br />----.,..,,.---------/ <br />ffe396 <br />EXJSTING HOUSE <br />#1404 <br />EXISTING HOUSE <br />~ / <br />/ 0· !?)0 / <br />r::{ / <br />/ ~-!?)0 I / r::{ I / ro· I / !?)0 <br />I / / <br />I / / <br />Jc,.A\ I <br />I / <br />/ <br />9/ / / <br />I I <br />I <br />/ <br />/ <br />/ <br />I <br />I <br />I / <br />IA <br />I ' <br />' I <br />I <br />I <br />I <br />I <br />I <br />I <br />75 <br />I <br />I <br />.A / <br />I // <br />/ <br />I <br />1/ <br />/ <br />/ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />,---._ <br />Q_ <br />~ <br />0 <br />El <br />2 -.___,, <br />co. <br />co <br />0) <br />""'" <br />I <br />I <br />► <br />/ <br />/ <br />/ <br />/ <br />/ <br />RECEIVED <br />AUG' 03L1l15- <br />C1TY OF ORONO <br />------------I <br />I <br />NUMBERED NOTES <br />~ INSTALL SILT SOCK FENCE TO START OF SOIL DISTURBING <br />ACTIVITIES. <br />~ INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PRIOR TO <br />START OF SOIL DISTURBING ACTIVITIES. <br />----------,--/ <br />BUILDING SETBACKS <br />ZONING: LR-1C = ONE-FAMILY LAKESHORE <br />HOUSE: FRONT= 30 FT <br />SIDE = 10 FT <br />HARDCOVER REAR (OHW) = 75 FT REFERENCE BENCHMARK <br />EXISTING IMPERVIOUS SURF ACES <br />PROPOSED IMPERVIOUS SURF AC ES <br />TOTAL LOT AREA <br />EXISTING HARDCOVER <br />PROPOSED HARDCOVER <br />3,292 SQ. FT. <br />3,100 SQ. FT. <br />12,308 SQ. FT. <br />27 % <br />25 % <br />ELEVATION = 931.76 @ SEWER MANHOLE <br />RIM AT 1392 BALDUR PARK RD. <br />LEGAL DESCRIPTION <br />Lot 15, Block 1, BALDUR PARK, <br />Hennepin County, Minnesota <br />JOB NAME: STEVE EWOTT <br />\ <br />I <br />I <br />I <br />)(' <br />0 20 40 --~. 0 <br />LEGEND <br />DENOTES FOUND PROPERTY IRON <br />DENOTES SET 1 /2" X 18" REBAR <br />WITH PLASTIC CAP "PLS 25105" <br />----DENOTES BOUNDARY LINE <br />-DENOTES LOT LINE <br />------DENOTES SETBACK LINE <br />,,--999 --DENOTES EXISTING CONTOUR LINE <br />x999.99 DENOTES EXISTING SPOT ELEVATION <br />CI] DENOTES CONCRETE SURFACE <br />-+--DENOTES DRAINAGE FLOW <br />FFE DENOTES FINISH FLOOR ELEVATION <br />0 DENOTES DECIDUOUS TREE <br />--o--DENOTES WIRE FENCE <br />--□--DENOTES WOOD FENCE <br />-OE--DENOTES OVERHEAD ELECTRIC <br />C-0..., DENOTES ELECTRIC POWER POLE <br />E--DENOTES GUY ANCHOR <br />@ DENOTES MANHOLE <br />DENOTES RETAINING WALL <br />----BBE3-B DENOTES SILT FENCE <br />I xxx.x I DENOTES PROPOSED GRADE <br />,,.---@K)--DENOTES PROPOSED CONTOUR <br />SEDIMENT & EROSION CONTROL NOTES <br />1. ALL EXPOSED SOIL AREA, INCLUDING TEMPORARY STOCKPILES, MUST BE <br />STABILIZED AS SOON AS POSSIBLE BUT IN NO CASE LATER THAN 14 DAYS AFTER <br />CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR <br />PERMANENTLY CEASED. STABILIZE WITH TEMPORARY SEED AND STRAW MULCH <br />APPLIED AT 2 TONS PER ACRES. <br />2. SILT FENCE SHALL BE INSTALLED AND AT THE LOCATIONS SHOWN ON THE PLAN <br />AND AROUND ANY STOCKPILES. SILT FENCE SHALL BE INSPECTED AND MAINTINED <br />WEEKLY (AND WITHIN 24 HRS OF A 0.5" RAINFALL) UNTIL FINAL SEEDING AND <br />MULCHING (OR SODDING) OF LOT. <br />3. DUST CONTROL IS THE RESPONSIBILITY OF THE PERMIT HOLDER. THE PERMIT <br />HOLDER MUST ELIMINATE DUST PROBLEMS UPON RECEIVING NOTICE FROM THE <br />BUILDING OFFICIAL THAT THERE IS A DUST PROBLEM. <br />4. STREET CLEANING SHALL OCCUR DAILY OR AS NEEDED. <br />5. BILL BRUEGGEMAN (612.308.2500) IS RESPONSIBLE FOR THE CLEANLINESS OF THE <br />SITE AND THE MAINTENANCE OF THE EROSION AND SEDIMENT CONTROLS. <br />6. THE STOCKPILE LOCATION SHALL BE AT THE SOUTHEAST CORNER OF THE LOT <br />· (SET BACK 20' FROM FRONT PROPERTY LINE). <br />7. SITE ACCESS SHALL BE VIA A ROCK CONSTRUCTION ENTRANCE AT PROPOSED <br />DRIVEWAY. TO THE EXTENT PRACTICABLE, HEAVY EQUIPMENT AND TRUCKS SHALL <br />BE PROHIBITED FROM PARKING OUTSIDE OF THE GRAVEL PAD AT SITE ACCESS. <br />8. AS IS PRACTICABLE, BUILDER TO MAINTAIN CONTINUOUS SILT FENCE ACROSS TH <br />SITE ACCESS WHEN NOT IN USE. <br />9. IN THE CA$2 OF PUMPED DISCHARGE, CONTRACTOR MUST FILTER ANY TURBID <br />WATER THROUGH SAND AND SILT FENCE BEFORE DISCHARGING TO STREET. iNLE <br />PROTECTION MUST BE IN PLACE. <br />10. EROSION AND SEDIMENT CONTROL BMPS SHOULD BE INSTALLED AND INSPECTE <br />BY THE CITY PRIOR TO ANY LAND DISTURBING ACTIVITIES. THE CONTRACTOR <br />MUST PROVIDE A MINIMUM 24 HOUR NOTICE PRIOR TO INSPECTION. <br />1 11/01/13 MEET NEW REQUIREMENTS £P #3773 <br />NO. DA TE D£SCRIP710N BY <br />FIELD WCRK DATE: 02/19/13 DRAWN BY: EP PROJECT NO.: 12-116