My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-12-28 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
736 Dickey Lake Drive - 27-118-23-33-0006
>
Septic
>
1984-12-28 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 12:08:04 PM
Creation date
9/17/2025 12:04:06 PM
Metadata
Fields
Template:
x Address Old
House Number
736
Street Name
Dickey Lake
Street Type
Road
Address
736 Dickey Lake Road
PIN
2711823330006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L4 Vv- U 2 <br />� 2 <br />SYSTEM DESIGN <br />FOR GARY RODERICK <br />LOT 3, BLOCK I, RINGERSW000 3 <br />ORONO, MINNESOTA <br />CIS Y <br />12-28-84 <br />1. Percolation Rate, Type of System. <br />Percolation tests were taken by others. From information supplied, the pri- <br />mary site had a rate of 18 minutes per inch, but a possible water table at <br />1.5 feet. Thus, a pressure mound system according to basal width would be <br />required. Contour lines shown on the attached drawing were from our own <br />topography taken recently. <br />2. Proposed Flow Rate. <br />4 bedrooms @ 150 G.P.D. is 600 G.P.D. <br />3. Soil Treatment Area Needed. <br />600 G.P.D. x 0.83 factor is 500 Sq. Ft. of rock bed area or a bed 10' wide <br />by 50' long. <br />4. Septic Tanks and Distribution System. <br />Two septic tanks of 1000 gallons each are recommended. In addition, a third <br />pumping tank will be needed to house the pump required for pressure distri- <br />bution to the mound area. Distribution to the rock bed is to be through 3 <br />perforated laterals 40" apart All construction and materials should adhere <br />to the provisions of the city of Orono. <br />5. Mound Dimensions. <br />o r a percolation rate of 18 MPI a factor of 2.00 would be used as the <br />minimum. However, since it appears from the results that one hole was not <br />used in calculating the average, a factor of 2.67 used for 46-60 MPI should <br />be used. This would result in a total basal width of 10 x 2.67 or 26.7 feet. <br />Since the ground slope is around 6% only the downslope can be used for this <br />width. Thus, this downslope dimension will have to be 26.7-10 or 16.7 feet. <br />However, with the high water table 2 feet of sand will be needed instead of <br />I foot. Thus, the mound will be 4 feet high instead of 3 feet, and with a <br />minimum allowable sideslo pe of 3:1 the downslope side would need to extend <br />16.8 feet. All other sides of the mound would slope down at a minimum of <br />3:1. <br />If there are any other questions, please contact me. <br />Sincerely, <br />PERCOR, INC. ,+ <br />Mark S. Gronberg, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.