Laserfiche WebLink
I ~ DATE TIME <br />W <br />Z <br />Q <br />J <br />W <br />Z <br />J <br />Z <br />O <br />to <br />CC <br />W <br />a <br />cc <br />O <br />O <br />Qc <br />O <br />W <br />W <br />CC <br />Q <br />W <br />W <br />CC <br />j <br />O <br />W <br />QZ <br />W <br />O <br />O <br />U <br />CITY OF ORONO CALLED IN <br />INSPECTION NOTICE SCHEDULED <br />PERMIT NO. Rf7 23— OXI COMPLETED <br />ADDRESS <br />OWNER <br />CONTRACTOR <br />TELEPHONE <br />DESCRIPTION r" VV n 'fjo I tr Iyl <br />❑ <br />FOOTING <br />❑DEMO <br />-FINAL <br />❑ <br />POURED WALL <br />❑ <br />PLUMBING RI <br />❑ <br />FOUNDATION DRAIN TILE <br />❑ <br />PLUMBING FINAL <br />❑ <br />LATHE <br />❑ <br />MECHANICAL RI <br />❑ <br />FRAMING <br />❑ <br />MECHANICAL FINAL <br />❑ <br />INSULATION <br />❑ <br />WOOD BURNER/FIREPLACE <br />❑ <br />FINAL <br />❑ <br />WATER HOOK-UP <br />❑ <br />AS BUILT - SURVEY <br />❑ <br />SEWER HOOK-UP <br />❑ <br />DEMO - SITE <br />❑ <br />SEPTIC INSTALL <br />OWNERICONTRACTOR TO MEET <br />YOU: <br />_ YES _ NO <br />COMMENTS: <br />Y <br />r <br />❑ WORK SATISFACTORY: PROCEED <br />❑ CORRECT WORK 8 PROCEED <br />❑ CORRECT WORK, CALL FOR REINSPECTION <br />BEFORE COVERING <br />❑ CORRECT UNSAFE CONDITION WITHIN_ <br />INSPECTOR WILL RETURN <br />❑ STOP ORDER POSTED, CALL INSPECTOR <br />-IIlO <br />❑ SEPTIC FINAL <br />❑ EXCAV/GRADING/FILLING <br />❑ TREE REMOVAL <br />❑ SITE INSPECTION <br />❑ RATED WALLS <br />❑ COMPLAINT <br />❑ FOLLOW-UP <br />❑ FOUNDATION/REMOVAL <br />❑ PROJECT COMPLETE <br />❑ ISSUE CERTIFICATE OF OCCUPANCY <br />TEMPORARY <br />HOURS. ❑ pHOTOTAKEN <br />❑ CITATION ISSUED <br />❑ INSPECTION REQUIRED, CALL TO ARRANGE ACCESS. <br />Call for the next inspection 24 hours in advance. �952� 24g-46QQ <br />Inspector. <br />on <br />White Copyllnspector's File <br />Canary CopylSite Notice <br />