My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Submittal
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1392 Baldur Park Road - 08-117-23-31-0003
>
Land Use
>
75-53, VAR
>
Submittal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2025 12:32:47 PM
Creation date
9/15/2025 12:32:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCCOMBS-KNUTSON ASSOCIATES, INC. <br />CONSULTING ENGINEERS 2 LANO SURVEYORS • SITE PLANNERS <br />October 17, 1975 <br />Mr. Henry Muhich <br />Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, Minnesota 55323 <br />Subject: Erosion Control Measures on Lots 17 b 18, <br />Block 1, Baldur Park <br />Dear Hank: <br />The purpose of this letter is to inform you of our <br />recommended erosion control measures on Lots 17 and 18, <br />Block 1, Baldur Park, owned by Mr. Theodore W. Boer. Mr. <br />Boer intends to excavate along the northerly (lake) side <br />and northeasterly side of his home, for the pur,^ se of <br />constructing a basement under the home. Excavated material <br />will be used to fill low areas on the garage side of his <br />home and to fill an existing low area to the northeast of <br />the home (above the existing tree line). <br />Before excavation and fill operations commence, Mr. <br />Boer shall construct a temporary earthen berm at the base <br />of the existing steps to the lake. The berm shall he placed <br />between the emban,.ment to the west and the existing earthen <br />mound to the east of the steps. The berm shall be c, istructed <br />in such a manner as to divert run-off in an easterly direction <br />above (south of) the tree line into the existing fish pond, <br />where deposition of sediment can occur. The berm shall be <br />covered with straw to retard its erosion. <br />Mr. Boer shall place hay bales at the base of the slope <br />along the easterly property line (at the base of the proposed <br />fill area to the northeast of the home). <br />Material excavated prior to construction of the basement <br />shall be stockpiled on the garage side of the home (more than <br />75 feet from the Lakeshore) until backfilling of the foundation <br />is accomplished, Placement of the fill material shall be <br />12e05 OLSON MEMORIAL HIGHWAY MINNEAPOLIS MINNESOTA 55411 TELEPHONE $11 559.3700 <br />36 NORTH MAIN STREET HUTCHINSON MINNESOTA 55no TELEPHONE '412, 679 9029 <br />SOUTHWEST ENGINEEMING DIVISION MARSHAL MINNESOTA S82S4 TELEPHONE e507. S32 $620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.