My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 8/22/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 8/22/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:48 AM
Creation date
9/15/2025 12:03:01 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
8/22/1988
Retention Effective Date
9/15/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF REGULAR ORONO COUNCIL MEETING AUGUST 8, 1986 <br />BOHN'S POINT FEASIBILITY CONTINUED <br />upheld. Acting City Administrator Gerhardson stated that this <br />project does not compare with Woodhill in that Bohn's Point is <br />not a completely new road, it is only being overlaid. Also there <br />is only a 33' right-of-way through Bohn's Point. The City would <br />only be making the width even throughout the entire road, not <br />widening the entire road. Councilmemher Peterson asked for an <br />estimated cost of the project. Gerhardson stated that he could <br />not commit to a specific fee, but estimated the project to run <br />approximately $20,000.00. Councilmember Callahan reiterated <br />Goetten's concerns about upholding the 24' standard for roads in <br />Orono. He suggested that the feasibility study could include <br />widening Bohn's Point to meet that standard. Councilmember <br />Peterson asked if there would be an agreement drafted for the <br />residents of Bohn's Point Road to sign with regard to payment of <br />the fees for the study. Gerhardson assured her there -ould be <br />such an agreement. <br />Mayor Grabek asked the Council if any members wished to <br />apprise Mr. Nettles of the previous discussion that had taken <br />place or individual opinions that had formed wi;.h respect to the <br />proposed feasibility study. Councilmember Callahan stated that <br />since the study would include widening the road to 24', he may be <br />willing to vote in favor of it. Councilmember Nettles inquired <br />whether the study would include the effects of runoff and storm <br />sewer drainage. He mentioned the pond in Mr. Winslow's yard <br />Gerhardson stated that the study would show the areas of <br />drainage. <br />It was moved by Councilmember Goetten, seconded <br />Councilmember Nettles, to undertake a feasibility study for d <br />Bohn's Point Road upgrade which is to include the aspect of <br />widening the road to the 24' standard width. The residents must <br />enter into a written agreement with the City of Orono that would <br />verify that they (the residents) would be responsible for two- <br />thirds of the _ist of the study. Motion, Ayes=5, Nays=O, Motion <br />passed. <br />MINNEHAHA CREEK WATERSHED <br />OPERATION POLICY <br />City Manager Gerhardson asked if there were any questions <br />with regard to Mr. Finkelstein's report. Mayor Grabek thanked <br />Mr. Finkelstein for his efforts. <br />It was moved by Councilmember. Goetten, seconded by <br />Councilmember Peterson, to accept the report from Mr. Finkelstein <br />and instruct staff to bring the issue back to the Council when it <br />received information regarding the Waters Management Policy in <br />advance of the March 1989 renewal date. Motion, Ayes=5, Nays-0, <br />Motion passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.