My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 8/8/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 8/8/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:49 AM
Creation date
9/15/2025 9:36:44 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
8/8/1988
Retention Effective Date
9/15/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE RBGULAR ORONO COUNCIL MEETING HELD JULY 11, 1988 <br />there should be something that the City can help them with. <br />Bernhardson said that the City needs to find out what land uses <br />will be appropriate in the area and have a plan in place that <br />would serve as the framework for any redevelopment. He went on to <br />note that the traffic on Highways 12 and County Road 15 are <br />projected to increase significantly in the next 20 years (18,000 <br />to 33,000 for Highway 12 and from 13,000 to 22,000 for County <br />Road 15). There will be an upsurge of traffic through the Navarre <br />area. <br />Councilmember Peterson asked City Administrator Bernhardson if Mr. <br />Shardlow will go and speak with the property owners when he does <br />his study or does he just do the study himself? Bernhardson <br />replied that he does take inventory of the area with respect to <br />current land use, storm sewers, storm water ponding, soil types, <br />sewer and water services, transportation numbers, etc. From that <br />he and the City set out some goals for the planning process. The <br />goals would be determined by public meetings and as they continued <br />the process property owners, as they wished, participated in what <br />suggestions they had. Mr. Shardlow would not specifically contact <br />,the property owners, but would send notices to everyone in the <br />area affected by the proposed plans. Peterson questioned whether <br />there would be any interest in the project at all, in light of the <br />fact that there was little interest expressed by these owners <br />regarding the County Road 15 project. The !Mayor believes there <br />will be a variety of responses. If the City does not begin to <br />initiate a formalized plan, he believes the Navarre area will stay <br />as is for some time to core. Peterson expressed that she is in <br />favor of this study. Navarre really needs the upgrading. <br />Something should have been after the 1965 tornado. It was moved <br />by Mayor Grabek, seconded by Councilmamber Callahan to approve <br />contracting with John Shardlow for a Master Plan for the Navarre <br />area. Callahan believes that unless there is ar economic drive <br />from somewhere, whether it comes from the property owners in the <br />area or outside sources, the Navarre area will not go very far. <br />He is not sure that what Shardlow studied for the Highway 12 <br />project was anything he really wanted to know. There were items <br />that needed to be studied before the plan could be determined <br />because of existing pressure to do the development. However, the <br />Navarre situation mandates an impetus for development, there is no <br />interest for development at this time. Callahan believes that the <br />study will not be enough to prompt the Community into action. <br />That concerns him about spending the money on the study. He would <br />prefer to see some development interest first. The Mayor believes <br />there is the need of the City to have a plan and approach the <br />property owners. If not, the property owners will be happy to <br />keep things as they are. If the City understands the situation <br />and builds the parameters he believes they can utilize that and <br />raise some interest He does feel that the study needs to be done. <br />Councilmember Goetten believes that it's the role of the Council <br />to get involved with this. She feels that property owners would <br />be inclined to upgrade their property if they knew everyone was <br />going to. She believes that residents of the Community are <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.