My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-06-17 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
725 Dickey Lake Drive - 34-118-23-22-0006
>
Septic
>
1986-06-17 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 3:32:34 PM
Creation date
9/11/2025 3:24:25 PM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
Dickey Lake
Street Type
Drive
Address
725 Dickey Lake Drive
PIN
3411823220006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DESIGN <br />FOR FRITZ GULLICKSON <br />OF LOT 2, BLOCK 2, RINGERSWOOD <br />ORONO, MINNESOTA <br />5-23-86 <br />1. Percolation Rate, Type of System. <br />60 minutes per inch on the primary site. Pressure Mound System. <br />These rates were obtained by Carl Borg who tested the subdivi- <br />sion. This design is based on those rates only and it is agreed <br />that that these results have not been verified by us. <br />2. Proposed Flow Rate. <br />4 bedrooms @ 150 G.P.D. = 600 G.P.D. <br />3. Proposed Rock Bed Area Needed. <br />600 G.P.D. x 0.83 factor for using a minimum 12" depth of clean <br />sand under the rock bed = 500 Sq. Ft. or a 10' x 50' bed. <br />4. Dike Measurements based on Basal Width. <br />Basal Width ratio = 5.0 tirr2s 10' wide bed = 50'. Because the <br />average slope is slightly greater than 3%, the downslope width <br />can only be used and needs to be 50'-10' rock bed = 40' which <br />is also greater than a 4:1 slope, so is all right. The other <br />sides of the dike should be at least 4:1 slopes or out at least <br />12 feet. <br />5. Septic Tanks. <br />Two septic t%nks, of at least 1000 and 750 gallons respectively <br />are needed _. addition to a third pumping tank to house the <br />pump. Also, an alarm system is needed to warn of pump failure. <br />6. Distribution. <br />Distribution is to be by pressure to 3 perforated laterals in <br />the rock bed spaced 40" apart. <br />7. Additional Information. <br />All construction and materials must adhere to the provisions of <br />the City of Orono. All construction traffic must be kept off <br />both the primary and alternate drainfield sites, and these <br />areas should be marked off to ensure this. <br />If there are any additional quest_ons, <br />(i <br />�-L <br />please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg <br />PCA certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.