My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-06-17 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
725 Dickey Lake Drive - 34-118-23-22-0006
>
Septic
>
1986-06-17 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 3:32:34 PM
Creation date
9/11/2025 3:24:25 PM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
Dickey Lake
Street Type
Drive
Address
725 Dickey Lake Drive
PIN
3411823220006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DESIGN <br />FOR FRITZ GULLICKSON <br />OF LOT 2, BLOCK 2, RINGERSWOOD <br />ORONO, MINNESOTA <br />1. Percolation Rate, Type of System. <br />5.4 minutes per inch, Pressure Mound System. <br />2. Proposed Flow Rate. <br />4 bedrooms @ 150 G.P.D. = 600 G.P.D. <br />3. Proposed Rock Bed Area Needed. <br />600 G.P.D. x 0.83 factor for using a minimum of 12" of clean sand under the <br />rock bed = 500 Sq. Ft. or a 10' x 50' rock bed. <br />4. Dike Measurements based on Basal Width. <br />Basal Width ratio = 1.52 x 10' wide bed = 15.2 feet-10 feet for the bed = <br />only 5.2 feet out. However, use minimum sideslope of 4:1 so the mound will <br />have to extend out about 15 feet on each side and about 12 feet at the ends. <br />Since there is over 2 feet o; good black loam soils some minor grading <br />could be done to level the area under the rock bed. <br />5. Septic Tanks. <br />Two septic tanks, of at least 1000 and 750 gallons respectively, are needed <br />in addition to a third pumping tank to house the pump. Also, an alarm system <br />is needed to warn of pump failure. <br />6. Distribution. <br />Distribution is to be by pressure to 3 perforated laterals in the rock bed. <br />These are to be spaced 40" apart. <br />7. Additional Information_ <br />All construction and materials must adhere to the provisions of the City of <br />Orono. All construction traffic must be kept off both the primary and alter- <br />nate sites, and these areas should be marked off to ensure thin. <br />If there are any other questions, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />AMa�r&Se'eo_n5eorg','� PCA certifie <br />
The URL can be used to link to this page
Your browser does not support the video tag.