Laserfiche WebLink
Bonestroo 35 West Highway 36 ■ St. Paul, MN 55113 • <br /> Rosene Office: 651-636-4600 • Fax: 651-636-1311 ✓--- <br /> Anderlik& www.bonestroo.com <br /> Associates <br /> Engineers&Architects <br /> January 6,2006 • a 9 2006 <br /> Mr.Michael Gaffron CIT' Oj <br /> Planning Director T°No <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay,MN 55323 <br /> Re: 3165 North Shore Drive <br /> File No.000139-06000-0 <br /> Plat No.05-3135 <br /> Dear Mike: <br /> You and I met yesterday with the applicant's architect to review the revised plans for the proposed improvements to 3165 <br /> North Shore Drive.The site improvements include the construction of a new home and associated grading.The following <br /> is a summary of our comments from that meeting regarding Alternate Plan A: <br /> • The revised grading plan has improved the situation west of the home with the proposed swale containing <br /> drainage on the subject property. The drainage along the east side of the home will convey water across the <br /> neighboring property.Although a note on the plan indicates an easement will be necessary,the applicant may <br /> want to consider some type of a lot line rearrangement with the neighbor so that an easement is not necessary. <br /> • The grading plan should incorporate some type of a swale between the turnaround shown north of the home and <br /> the top of the garage so that drainage is not routed over the garage onto the driveway. <br /> • The proposed retaining wall along the driveway to the garage approaches 10-feet in height and will require a <br /> separate engineered design and detail submittal for review and approval. <br /> • The applicant's architect informed us that the fill necessary to complete the grading as shown will exceed 2000 <br /> cubic yards.It is worth considering moving the proposed home northerly and turning it slightly so that the front <br /> of the home is closer to parallel with the shoreline to minimize the fill necessary and to improve views to the <br /> lake. <br /> • The applicant should commission a geotechnical firm to verify existing soil conditions and certify that the <br /> existing foundation is adequate to support the proposed improvements.Soils in this area may be marginal and <br /> the applicant should at least determine whether or not pilings will be necessary. <br /> • Pre and post construction drainage calculations should be provided for the 2, 10,and 100-year storm events. <br /> Post construction discharges off site shall not exceed existing discharges. <br /> If you have any questions please call me at(651)604-4863. <br /> Yours very truly, <br /> BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC. <br /> Tom Kellogg <br /> Cc: Greg Gappa,City of Orono <br /> St. Paul, St. Cloud, Rochester, MN • Milwaukee, WI ■ Chicago, IL <br /> Affirmative Action/Equal Opportunity Employer and Employee Owned <br />