Laserfiche WebLink
The second alternate provides for constructing a gravity line from Lift <br />Station #10 to the proposed MYCC interceptor (MH 165A to 167B). The construc- <br />tion of three other sewer line segments is proposed to improve flow to the <br />Lift Station 110 collection point and prevent future backups. The sanitary <br />sewer line along County Road 19 from Lift Station 110 to Maple Place (MH 167B <br />to 169A). The sanitary sewer line on Maple Place from County Road 19 to <br />Cherry Avenue (MH 169A to MH 175A). The sanitary sewer line from Minnie <br />Avenue to County Road 151 (MH 179 to MH 430). The extension of the additional <br />lines will provide adequate capacity to ser•re Service Area 4. <br />Page 5. <br />RPT13940 <br />