My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
07-25-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/9/2025 1:29:36 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
7/25/1988
Retention Effective Date
9/9/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTRODUCTION <br />This report reviews the feasibility of upgrading Lift Station 110 or re- <br />placing it with a gravity sewer line. The lift station capacity has been <br />exceeded several times over the past 5 years resulting in sewage being backed <br />up into casements. This problem can be solved by upgrading the lift station <br />to handle the excess flow or by constructing a new gravity sewer line. <br />The relocation of Lift Station 145, on the MYCC sewer system, near the <br />public access north of CSAH 51 makes it possible to eliminate Lift Station <br />110. The construction of a gravity line would reduce the City's long term <br />maintenance costs for sanitary sewer service in Service Area 4. <br />The MUCC construction project is planned to begin in the fall of 1988 and <br />be completed during the summer of 1989. If the City elects to proceed with <br />this project, the construction should take place in 1989. This will allow the <br />City to obtain the greatest bidding advantage and minimize the length of time <br />the area is disrupted. <br />The report also reviews the upgrading of sewer lines upstream of Lift <br />Station 110. The lines will be increased to provide for future connections <br />and eliminate a capacity problem in the existing system. <br />Page 3. <br />RPT13940 <br />
The URL can be used to link to this page
Your browser does not support the video tag.