My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
07-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/9/2025 11:01:07 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
7/11/1988
Retention Effective Date
9/9/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Navarre Redevelopment Plan Page 3 <br />PHASE 1: PLANNING <br />I. Develop preliminary con-ept plans and alternatives to illustrate potential future land uses, <br />circulation, open space, major utilities, and potential building scale and location. <br />1. Prepare a summary of the pertinent data and development statistics for the properties under <br />consideration, including size and nature of development activity, existing and future land and <br />building values, and fiscal implications. <br />3. Prepare a memorandum summarizing in writter. and graphic form the alternative concepts and <br />pertinent information described above, and present it to the City Council and Planning Com- <br />mission. This memorandum will include traffic generation analysis reflecting the potential impact <br />of proposed land use changes on surrounding streets. <br />4. Prepare exhibits and data suitable for public presentation of the the key issues and concepts <br />involved, and prepare a presentation of these and othe, important information for the workshop <br />with the City Council and Planning Commission. <br />PRASE It: IMPLEMENTATION <br />1. P-epare amendments to the Comprehensive Plan, with findings as appropriate, which reflect the <br />concepts adopted in the previous phase, for review and approval by the Planning Commission <br />and City Council with the adopted results prepared for submission to the Metropolitan Council. <br />?. In consultation with City administrator, City .Attorney, and other staff, prepare amer iments to <br />the 'Zoning Ordinance to implement the concepts adopted in the previous phase, including <br />application of new Zoning Districts to the properties in the study area, changes to the Official <br />Zoning Map, and enhanced performance standards to protect the integrity of existing surround- <br />ing land uses and to guide future developments. <br />3 At the City's direction and working closely with the CITY Fiscal Consultant ant' CITY staff, <br />the CONSULTANT will pre arc a preliminary Tax Increment Financing Feasibility Study. <br />PHASE [it: FINAL WIPORT (Optional) <br />Edit, prepare a0 have printed a final report documenting the research, analysis, goals. plans, <br />implementation t )ols, and promotion strategies outlined in all I,hases above The report ww be <br />include two solo, printing of graphics, and high quality materials and design. <br />t)�Minn. ;,h�Nkrw, snd l!bsn, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.