Laserfiche WebLink
4. ` Management CaporatK G 1- 141� l T <br />P1- ,BX- 1h16R 3WO Rper Affray Tom <br />MinneaWis. Minnesola 54( <br />Cie .....low <br /><' ,(Z_ S ni r V �:4 sdenl PETITION <br />AffinwCapM1 ,D, representing more than 35% of the owners of <br />property located on tsonn's Point Road, in the City of Orono, do <br />hereby request that the City of Orono perform a feasibility study to <br />determine the feasibility and cost of widening Bohn's Point Road to <br />22 feet, the circle at the end thereof to 20 feet, and repaving the <br />same with a bituminous overlay. We further request that the study <br />examine the feasibility and costs of various curb installations, <br />particularly a tar curb. <br />Na <br />1-1-1 rldl <br />Address <br />/-� A-k <br />Date <br />�j <br />N a4ne <br />Address <br />6 /.,-, /", - <br />Date <br />riame <br />Address <br />Date <br />l -1 2_ S 4)01n <br />Address <br />Date <br />Name <br />Ar,41als`2E�#"s .r. Pam. <br />Address <br />6 -L-W <br />Date <br />Name <br />Address <br />Date ' <br />